V N G Constr. Inc - Dba All Type Remodl
- Based in
- Sacramento
- On San Francisco permits
- May 2014 to Mar 2017
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 8 days from filing to permit and 186 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2016 | Completed final sign-off Jul 2016 | 12 Esquina Dr | revision to pa#201508043215, rebuild dry rotten int. stair per plan (same to same), replace window @ 2nd floor, not visable from streetDetails
revision to pa#201508043215, rebuild dry rotten int. stair per plan (same to same), replace window @ 2nd floor, not visable from street | $3,000 |
| Jan 8, 2016 | Completed final sign-off Jan 2016 | 2806 36th Av | revision to app#201409035283 and comply with complaint #201402194. 2nd floor: change master bedroom tub to a shower. relocate closet and reconfigure stairs.Details
revision to app#201409035283 and comply with complaint #201402194. 2nd floor: change master bedroom tub to a shower. relocate closet and reconfigure stairs. | |
| Sep 3, 2014 | Completed final sign-off Jan 2016 | 2806 36th Av | 1st flr: add habitable space including full bath, 2nd flr: remodel kitchen & bath, add a bathroom, re-build interior stair connecting 1st flrDetails
1st flr: add habitable space including full bath, 2nd flr: remodel kitchen & bath, add a bathroom, re-build interior stair connecting 1st flr | $90,000 |
| May 29, 2014 | Completed final sign-off Apr 2015 | 65 Meda Av | interior remodel of kitchen and bathrooms. add new master bath and closet. alter interior stair to new access 1st floor/garage level. remove rear ext stairs.Details
interior remodel of kitchen and bathrooms. add new master bath and closet. alter interior stair to new access 1st floor/garage level. remove rear ext stairs. | $40,000 |