V Mash Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Jul 2026
- Last 24 months
- 6 permits filed
63 permits since 2000: 42 completed, 5 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 2 never finaled. Typically 18 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 2, 2022 | Never finaled issued Aug 2022, no final | 46 Bache St | vertical addition to portion of existing attic. interior remodel. add deck on rear of additionDetails
vertical addition to portion of existing attic. interior remodel. add deck on rear of addition | $75,000 |
| Sep 3, 2020 | Never finaled issued Sep 2020, no final | 514 Jersey St | existing deck repair less than 50% at back of property, new deckin over existing membarne, raise guardrail to 42"Details
existing deck repair less than 50% at back of property, new deckin over existing membarne, raise guardrail to 42" | $5,000 |
| Aug 5, 2020 | Completed final sign-off Mar 2021 | 514 Jersey St | interior remodel to bathroom, bedroom and closet. deck surface replacementDetails
interior remodel to bathroom, bedroom and closet. deck surface replacement | $57,000 |
| Apr 29, 2013 | Completed final sign-off Apr 2014 | 643 17th Av | plywood shear wall to rear most volume of home. re-build rear deck. 1st level kitchen, bath renovation.Details
plywood shear wall to rear most volume of home. re-build rear deck. 1st level kitchen, bath renovation. | $75,000 |