Back to bathroom remodel contractors
V Mash Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Jul 2026
- Last 24 months
- 6 permits filed
63 permits since 2000: 42 completed, 5 in progress, 10 never finaled, 6 expired or cancelled.
Of the 10 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 23 completed, 2 in progress, 1 never finaled, 3 expired or cancelled. Typically 4 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2026 | Completed final sign-off Jul 2026 | 3569 17th St | kitchen and full bath remodel. relocate laundry.Details
kitchen and full bath remodel. relocate laundry. | $70,000 |
| Apr 16, 2025 | In progress issued May 2025 | 114 Divisadero St | remodel master bedroom located at basement level unit. add (n) bathroom . replace 2x exterior doors located at rear in kind not visible from street. replace (e) ktichen light fixture with led light fixture.Details
remodel master bedroom located at basement level unit. add (n) bathroom . replace 2x exterior doors located at rear in kind not visible from street. replace (e) ktichen light fixture with led light fixture. | $250,000 |
| Mar 21, 2025 | In progress issued Mar 2025 | 1001 Greenwich St | reface (e) kitchen cabinets and new counter tops remodel primary bathroom in kind replace tub and replace shower stall remodel guest batroom in kind replace tub and replace shower stallDetails
reface (e) kitchen cabinets and new counter tops remodel primary bathroom in kind replace tub and replace shower stall remodel guest batroom in kind replace tub and replace shower stall | $78,000 |
| Jul 25, 2024 | Completed final sign-off Jan 2025 | 602 Funston Av | remodel (1) primary bathroom, replace tub & new tile floor & wall. remodel (1) kitchen, replace new cabinets & new floor.Details
remodel (1) primary bathroom, replace tub & new tile floor & wall. remodel (1) kitchen, replace new cabinets & new floor. | $60,000 |
| Apr 5, 2024 | Completed final sign-off Feb 2025 | 812 Hampshire St | kitchen remodel - remove and replace cabinets, flooring, counter, drywall. bathroom remodel - remove and replace vanity, flooring. replace bathtub w/ shower.Details
kitchen remodel - remove and replace cabinets, flooring, counter, drywall. bathroom remodel - remove and replace vanity, flooring. replace bathtub w/ shower. | $60,000 |
| Nov 17, 2023 | Completed final sign-off Feb 2024 | 1660 Newcomb Av | demo bathroom, install new tub with shower, new vanity, tile walls and floor. new plumbing and electrical in bathroom.Details
demo bathroom, install new tub with shower, new vanity, tile walls and floor. new plumbing and electrical in bathroom. | $22,000 |
| Jun 24, 2022 | Completed final sign-off Jan 2023 | 514 Jersey St | remodel one 1st floor bathroom with same layout. remodel one kitchen keeping same layout. sand hardwood floors on lower level.Details
remodel one 1st floor bathroom with same layout. remodel one kitchen keeping same layout. sand hardwood floors on lower level. | $80,000 |
| Jan 26, 2022 | Completed final sign-off Jun 2022 | 1275 12th Av | (2) bath remodel. demo guest bathroom down to studs install new vanity toilet and shower in closure drywall and tile. demo tile around tub and wainscoting in master bath install new tile and replace fixtures keep existing tub sink and toilet in same locations. all non structural work.Details
(2) bath remodel. demo guest bathroom down to studs install new vanity toilet and shower in closure drywall and tile. demo tile around tub and wainscoting in master bath install new tile and replace fixtures keep existing tub sink and toilet in same locations. all non structural work. | $50,000 |
| Aug 5, 2020 | Completed final sign-off Mar 2021 | 514 Jersey St | interior remodel to bathroom, bedroom and closet. deck surface replacementDetails
interior remodel to bathroom, bedroom and closet. deck surface replacement | $57,000 |
| Jun 12, 2020 | Expired or cancelled expired Dec 2025 | 1880 Jackson St | unit 104: remodel kitchen , foyer, bathrooms and closets. costmetic update to windows, lhighting and floors throughout unit. maher n/a.Details
unit 104: remodel kitchen , foyer, bathrooms and closets. costmetic update to windows, lhighting and floors throughout unit. maher n/a. | $87,000 |
| Jan 13, 2020 | Completed final sign-off Nov 2020 | 2200 Pacific Av | remove tiles around tub in master bathroom remove tub, insall new tub and tiles on walls and floors. cange vanity for new one. no structural work under this permit.Details
remove tiles around tub in master bathroom remove tub, insall new tub and tiles on walls and floors. cange vanity for new one. no structural work under this permit. | $18,000 |
| Nov 26, 2019 | Completed final sign-off Jun 2020 | 150 Belvedere St | kitchen and extg full bath renovation. new cabinets, fixtures and tile. relocate 1 window and replace one exterior door and 3 windows. not visible to the street.Details
kitchen and extg full bath renovation. new cabinets, fixtures and tile. relocate 1 window and replace one exterior door and 3 windows. not visible to the street. | $75,000 |
| Oct 25, 2019 | Completed final sign-off Sep 2020 | 1080 Haight St | front bldg. revision to 200102222744. relocate partition walls at basement. 1/2 bath, laundry room, wine storage.Details
front bldg. revision to 200102222744. relocate partition walls at basement. 1/2 bath, laundry room, wine storage. | |
| Jun 26, 2019 | Completed final sign-off Aug 2019 | 81 San Felipe Av | demo existing bathroom, remove tub and install walk-in shower. update electrical. no relocation of walls. bathroom: 6' x 12'Details
demo existing bathroom, remove tub and install walk-in shower. update electrical. no relocation of walls. bathroom: 6' x 12' | $18,000 |
| Jun 13, 2017 | Completed final sign-off Oct 2017 | 1187 Dolores St | revision to 201401106050 eliminate stair from 2nd fl, change full bath to 1/2 bath, replace 3 windows. no bldg extension, not visible from streetDetails
revision to 201401106050 eliminate stair from 2nd fl, change full bath to 1/2 bath, replace 3 windows. no bldg extension, not visible from street | $1,000 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 2483 Sutter St | remove old bath tub and vanity. install new fixtures bath vanity and tileDetails
remove old bath tub and vanity. install new fixtures bath vanity and tile | $15,000 |
| Feb 24, 2017 | Completed final sign-off Oct 2017 | 190 Taraval St | update (e) bathroom and add new bathroom at second floor.Details
update (e) bathroom and add new bathroom at second floor. | $16,000 |
| Dec 28, 2016 | Expired or cancelled expired Jul 2024 | 1070 Haight St | unit #4: kitchen and 2 baths removation . replace 3 side windows in kind - not visible from the street. remove 1 (e) skylight and install 2 new skylights. interior roof retrofit per structural drwgs (no change to exterior envelope)Details
unit #4: kitchen and 2 baths removation . replace 3 side windows in kind - not visible from the street. remove 1 (e) skylight and install 2 new skylights. interior roof retrofit per structural drwgs (no change to exterior envelope) | $50,000 |
| Dec 27, 2016 | Completed final sign-off Mar 2018 | 643 17th Av | convert partial basement space to living space(402 sq ft) including 1 bedroom, 1 full bath and laundry. new foundation and slab on grade.Details
convert partial basement space to living space(402 sq ft) including 1 bedroom, 1 full bath and laundry. new foundation and slab on grade. | $75,000 |
| Sep 14, 2016 | Expired or cancelled expired Jul 2024 | 1070 Haight St | bath & kitchen remodel.Details
bath & kitchen remodel. | $22,000 |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 1080 Haight St | rear bldg. - revision to pa#200102222745 & 201604154861, add electric washer dryer in bathroom, change location of kitchen to back of bath wall.Details
rear bldg. - revision to pa#200102222745 & 201604154861, add electric washer dryer in bathroom, change location of kitchen to back of bath wall. | $200 |
| Apr 29, 2015 | Completed final sign-off Aug 2015 | 4709 25th St | remodel master bathroom with new tiles & fixts, remove wood floors. no alteration at wall & door. replace 1 window same size, same location facing back.Details
remodel master bathroom with new tiles & fixts, remove wood floors. no alteration at wall & door. replace 1 window same size, same location facing back. | $12,885 |
| Dec 17, 2014 | Completed final sign-off Aug 2015 | 1541 Kirkwood Av | 1st floor only - convert to living space (865 sf) incl 2 bedrooms, 2 half baths & laundary. replace 4 (e) windows & install 4 new windows at west side, not visible to street.Details
1st floor only - convert to living space (865 sf) incl 2 bedrooms, 2 half baths & laundary. replace 4 (e) windows & install 4 new windows at west side, not visible to street. | $30,000 |
| Apr 21, 2014 | Completed final sign-off Sep 2019 | 795 San Jose Av | 1/f: interior renovation includes 1 bath, 1/f side addition 108 s.f. below (e) 2/f, not visible to street. replace 2 windows & entry door at front, install 4 (n) windows & 1 exit door at south side, install 1 (n) window at rear.Details
1/f: interior renovation includes 1 bath, 1/f side addition 108 s.f. below (e) 2/f, not visible to street. replace 2 windows & entry door at front, install 4 (n) windows & 1 exit door at south side, install 1 (n) window at rear. | $95,000 |
| Jan 10, 2014 | Completed final sign-off Oct 2017 | 1187 Dolores St | converting 1st floor storage area into living room, installing staircase, & bathroom in unit 1187 #1Details
converting 1st floor storage area into living room, installing staircase, & bathroom in unit 1187 #1 | $48,000 |
| Apr 29, 2013 | Completed final sign-off Apr 2014 | 643 17th Av | plywood shear wall to rear most volume of home. re-build rear deck. 1st level kitchen, bath renovation.Details
plywood shear wall to rear most volume of home. re-build rear deck. 1st level kitchen, bath renovation. | $75,000 |
| Sep 6, 2012 | Completed final sign-off Apr 2013 | 643 17th Av | bath remodel, no structural, move plumbing fixtures tile around tub, install ceiling fan.Details
bath remodel, no structural, move plumbing fixtures tile around tub, install ceiling fan. | $9,000 |
| Apr 6, 2012 | Completed final sign-off Aug 2012 | 121 Brompton Av | add new dormer, remodel & expand existing bathroom.Details
add new dormer, remodel & expand existing bathroom. | $22,450 |
| Mar 12, 2010 | Completed final sign-off Aug 2010 | 72 Uranus Tr | install (n) half bath @ 9e) 1st. flr. living space. no change to overall square footage. non-structural.Details
install (n) half bath @ 9e) 1st. flr. living space. no change to overall square footage. non-structural. | $15,000 |