Back to bathroom remodel contractors
Us Bath Installation Inc
- Based in
- Rancho Cucamonga
- On San Francisco permits
- Jul 2018 to May 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 1 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 never finaled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2018 | Never finaled issued Oct 2018, no final | 2638 San Jose Av | bathroom #1: install new acrylic to tub liner over (e) tub. replace counter top, shower/tub trim and pressure balanced valve. no structural changes.Details
bathroom #1: install new acrylic to tub liner over (e) tub. replace counter top, shower/tub trim and pressure balanced valve. no structural changes. | $16,657 |