Us Bath Installation Inc
- Based in
- Rancho Cucamonga
- On San Francisco permits
- Jul 2018 to May 2019
- Last 24 months
- 0 permits filed
6 permits since 2000: 1 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2019 | Never finaled issued May 2019, no final | 94 Addison St | install new acrylic tub, new pressure valve, acrylic counters. no other work. no structural changes.Details
install new acrylic tub, new pressure valve, acrylic counters. no other work. no structural changes. | $8,335 |
| May 3, 2019 | Never finaled issued May 2019, no final | 149 Concord St | install tub liner over existing tub, new acrylic shoewr way system over existing new valve.Details
install tub liner over existing tub, new acrylic shoewr way system over existing new valve. | $7,456 |
| Apr 19, 2019 | Never finaled issued Apr 2019, no final | 879 Girard St | repair green board install tub liner wall surround, window trim, no structural change, tub area onlyDetails
repair green board install tub liner wall surround, window trim, no structural change, tub area only | $6,982 |
| Oct 23, 2018 | Never finaled issued Oct 2018, no final | 2638 San Jose Av | bathroom #1: install new acrylic to tub liner over (e) tub. replace counter top, shower/tub trim and pressure balanced valve. no structural changes.Details
bathroom #1: install new acrylic to tub liner over (e) tub. replace counter top, shower/tub trim and pressure balanced valve. no structural changes. | $16,657 |
| Sep 7, 2018 | Completed final sign-off Nov 2018 | 1546 40th Av | install tub liner acrylic wall surround and shower valve. no structural change.Details
install tub liner acrylic wall surround and shower valve. no structural change. | $8,990 |
| Jul 24, 2018 | Never finaled issued Jul 2018, no final | 1255 06th Av | install tub liner, acrylic wall surround, replace shower valve. no structural changes.Details
install tub liner, acrylic wall surround, replace shower valve. no structural changes. | $6,414 |