Urbnbuild Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to May 2026
- Last 24 months
- 6 permits filed
26 permits since 2000: 19 completed, 3 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 in progress. Typically 534 days from filing to permit and 672 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2025 | In progress issued Jul 2025 | 206 Andover St | remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck sizeDetails
remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck size | $1,000,000 |
| Oct 12, 2021 | Completed final sign-off Sep 2025 | 226 Palo Alto Av | add a horizontal addition to the rear yard which will be within the current foot print of the existing deck. the proposal will be 15" from the rear property line-same distance as teh existing deckDetails
add a horizontal addition to the rear yard which will be within the current foot print of the existing deck. the proposal will be 15" from the rear property line-same distance as teh existing deck | $450,000 |
| Aug 20, 2020 | Completed final sign-off Sep 2023 | 4315 21st St | remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows.Details
remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows. | $255,000 |