Back to bathroom remodel contractors
Urbnbuild Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2014 to May 2026
- Last 24 months
- 6 permits filed
26 permits since 2000: 19 completed, 3 in progress, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 in progress. Typically 171 days from filing to permit and 720 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2025 | In progress issued Jul 2025 | 206 Andover St | remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck sizeDetails
remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck size | $1,000,000 |
| Jun 21, 2023 | Completed final sign-off Jul 2025 | 2590 Green St | interior renovation-@ 2nd story renovate (e) kitchen, (e) butler pantry. (e) powder room at 3 story renovate (e) primary bathroom, (e) primary closet & (n) closet at (e) bedrooms. 2&3 (n) finishes, fixtures & framing where shown in plans, kitchen window relocated. not visible from public right of waDetails
interior renovation-@ 2nd story renovate (e) kitchen, (e) butler pantry. (e) powder room at 3 story renovate (e) primary bathroom, (e) primary closet & (n) closet at (e) bedrooms. 2&3 (n) finishes, fixtures & framing where shown in plans, kitchen window relocated. not visible from public right of wa | $160,961 |
| Feb 16, 2023 | Completed final sign-off Jul 2025 | 2590 Green St | new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows.Details
new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows. | $650,000 |
| Jun 3, 2022 | Completed final sign-off Sep 2025 | 226 Palo Alto Av | 19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred.Details
19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred. | $350,000 |
| Feb 12, 2021 | Completed final sign-off Aug 2021 | 264 28th St | revision to pa #201904097477 - 5 new windows at rear of house along the side, not visible from street. new hot water radiant heating in floor for new addition, rather than using (e) forced air furnace. remove a closet and enlarging a bathroom. new guardrail for roof deck, not visibleDetails
revision to pa #201904097477 - 5 new windows at rear of house along the side, not visible from street. new hot water radiant heating in floor for new addition, rather than using (e) forced air furnace. remove a closet and enlarging a bathroom. new guardrail for roof deck, not visible | $8,500 |
| Aug 20, 2020 | Completed final sign-off Sep 2023 | 4315 21st St | remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows.Details
remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows. | $255,000 |
| Apr 9, 2019 | Completed final sign-off Aug 2021 | 264 28th St | addition of a new stairhall on 23st side of the building to access new habitable space @ the ground floor consisting of family room, family room alcove & full bathroom. new roof deck on top family room.Details
addition of a new stairhall on 23st side of the building to access new habitable space @ the ground floor consisting of family room, family room alcove & full bathroom. new roof deck on top family room. | $285,000 |