Permit GraphShortlistSan Francisco building permits since 2000

Urbnbuild Inc

Contractor license
1047320
State license record
Based in
San Francisco
On San Francisco permits
Oct 2014 to May 2026
Last 24 months
6 permits filed

26 permits since 2000: 19 completed, 3 in progress, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Bathroom remodel permits

AllRoof deck 4Deck 3Stairs 4Kitchen remodel 5Bathroom remodel 7

7 bathroom remodel permits: 6 completed, 1 in progress. Typically 171 days from filing to permit and 720 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 18, 2025In progress
issued Jul 2025
206 Andover Stremodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck size
Details
Permit
202503182437
Status
issued
Filed
Mar 18, 2025
Permit issued
Jul 24, 2025
Declared cost
$1,000,000
Address
206 Andover St

remodel (e) sfh.foundation replacement & ground floor main bedroom, bath, & closet remodel, reclaiming (e) garage space. (n) interior stair locatin & kitchen remodel. (n) millwork and interior finishes and fixtures throuhgout (n) fiber cement siding, (n) windows and doors, reduce rear deck size

Open the permit page

$1,000,000
Jun 21, 2023Completed
final sign-off Jul 2025
2590 Green Stinterior renovation-@ 2nd story renovate (e) kitchen, (e) butler pantry. (e) powder room at 3 story renovate (e) primary bathroom, (e) primary closet & (n) closet at (e) bedrooms. 2&3 (n) finishes, fixtures & framing where shown in plans, kitchen window relocated. not visible from public right of wa
Details
Permit
202306210550
Status
complete
Filed
Jun 21, 2023
Permit issued
Jul 7, 2023
Final sign-off
Jul 11, 2025
Declared cost
$160,961
Address
2590 Green St

interior renovation-@ 2nd story renovate (e) kitchen, (e) butler pantry. (e) powder room at 3 story renovate (e) primary bathroom, (e) primary closet & (n) closet at (e) bedrooms. 2&3 (n) finishes, fixtures & framing where shown in plans, kitchen window relocated. not visible from public right of wa

Open the permit page

$160,961
Feb 16, 2023Completed
final sign-off Jul 2025
2590 Green Stnew elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows.
Details
Permit
202302162077
Status
complete
Filed
Feb 16, 2023
Permit issued
Jun 9, 2023
Final sign-off
Jul 11, 2025
Declared cost
$650,000
Address
2590 Green St

new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows.

Open the permit page

$650,000
Jun 3, 2022Completed
final sign-off Sep 2025
226 Palo Alto Av19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred.
Details
Permit
202206035540
Status
complete
Filed
Jun 3, 2022
Permit issued
Mar 30, 2023
Final sign-off
Sep 24, 2025
Declared cost
$350,000
Address
226 Palo Alto Av

19 sqft horizontal addition to inner courtyard. remove 9 sqft from entry. replace (e) shingles with new vertical wood siding at 1-story. stucco at 2-story. replace all windows & doors. replace garage door. renovate stair, kitchen, bathrooms. mep deferred.

Open the permit page

$350,000
Feb 12, 2021Completed
final sign-off Aug 2021
264 28th Strevision to pa #201904097477 - 5 new windows at rear of house along the side, not visible from street. new hot water radiant heating in floor for new addition, rather than using (e) forced air furnace. remove a closet and enlarging a bathroom. new guardrail for roof deck, not visible
Details
Permit
202102124619
Status
complete
Filed
Feb 12, 2021
Permit issued
Aug 6, 2021
Final sign-off
Aug 31, 2021
Declared cost
$8,500
Address
264 28th St

revision to pa #201904097477 - 5 new windows at rear of house along the side, not visible from street. new hot water radiant heating in floor for new addition, rather than using (e) forced air furnace. remove a closet and enlarging a bathroom. new guardrail for roof deck, not visible

Open the permit page

$8,500
Aug 20, 2020Completed
final sign-off Sep 2023
4315 21st Stremodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows.
Details
Permit
202008202259
Status
complete
Filed
Aug 20, 2020
Permit issued
Jul 11, 2022
Final sign-off
Sep 18, 2023
Declared cost
$255,000
Address
4315 21st St

remodel and addition to an (e) single family home. remodel 1st floor interior. replace (e) rear lower sloped roof with (n) flat roof. replace(e) rear at grade deck with(n) deck. remodel 2nd floor bathrooms. replace (e) windows and doors in kind. replace select (e) windows and doors with (n) windows.

Open the permit page

$255,000
Apr 9, 2019Completed
final sign-off Aug 2021
264 28th Staddition of a new stairhall on 23st side of the building to access new habitable space @ the ground floor consisting of family room, family room alcove & full bathroom. new roof deck on top family room.
Details
Permit
201904097477
Status
complete
Filed
Apr 9, 2019
Permit issued
Sep 27, 2019
Final sign-off
Aug 31, 2021
Declared cost
$285,000
Address
264 28th St

addition of a new stairhall on 23st side of the building to access new habitable space @ the ground floor consisting of family room, family room alcove & full bathroom. new roof deck on top family room.

Open the permit page

$285,000