Upkeep Industries Inc
- Based in
- Concord
- On San Francisco permits
- Oct 2019 to Sep 2026
- Last 24 months
- 14 permits filed
20 permits since 2000: 18 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 10 completed, 2 in progress. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 90 Reuel Ct | building 10: repair (e) dry rot framing at exterior stair at 90 reuel court. patch finishes to match (e). provide new post and beam to replace (e). remove and reattach stair stringer.Details
building 10: repair (e) dry rot framing at exterior stair at 90 reuel court. patch finishes to match (e). provide new post and beam to replace (e). remove and reattach stair stringer. | $45,000 |
| Jan 7, 2026 | Completed final sign-off Feb 2026 | 1 Reuel Ct | weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches for (4) external stairways, street facing.Details
weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches for (4) external stairways, street facing. | $9,150 |
| Jan 7, 2026 | Completed final sign-off Jul 2026 | 50 Cashmere St | weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches for (4) external stairways, street facing.Details
weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches for (4) external stairways, street facing. | $9,150 |
| Nov 21, 2025 | Completed final sign-off Jul 2026 | 15 Reuel Ct | bldg 6-weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches on 5 stair waysDetails
bldg 6-weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches on 5 stair ways | $11,150 |
| Nov 21, 2025 | Completed final sign-off Jul 2026 | 65 Reuel Ct | bldg 5-weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches on 3 stair waysDetails
bldg 5-weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches on 3 stair ways | $9,150 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 5 Cashmere St | weld iron mesh onto (e) metal stair. railing to reduce clear spacing to less than 4 inches. (5) exterior staircases at front.Details
weld iron mesh onto (e) metal stair. railing to reduce clear spacing to less than 4 inches. (5) exterior staircases at front. | $15,453 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 10 Cashmere St | weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches. (4) bridge walkways including attached steps - some street visible.Details
weld iron mesh onto (e) metal stair railing to reduce clear spacing to less than 4 inches. (4) bridge walkways including attached steps - some street visible. | $15,453 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 603 Keith St | weld iron mesh onto existing metal stair railing to reduce clear spacing to less than 4" (5 staircase total)Details
weld iron mesh onto existing metal stair railing to reduce clear spacing to less than 4" (5 staircase total) | $15,453 |
| Nov 6, 2025 | Completed final sign-off Jul 2026 | 55 Cashmere St | weld iron mesh onto existing metal stair railing to reduce clear spacing to less than 4" (4 staircase in total)Details
weld iron mesh onto existing metal stair railing to reduce clear spacing to less than 4" (4 staircase in total) | $15,453 |
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 282 Moscow St | revision to 202506209119: build back front stairs according to plans, stair will be built in kind of originalDetails
revision to 202506209119: build back front stairs according to plans, stair will be built in kind of original | $39,000 |
| Jun 20, 2025 | Completed final sign-off Dec 2025 | 282 Moscow St | remove all stucco from front of house and restucco. demo old marble stairs and replace with new tiles on stairs.Details
remove all stucco from front of house and restucco. demo old marble stairs and replace with new tiles on stairs. | $76,500 |
| Jun 12, 2024 | In progress issued Sep 2024 | 60 Surrey St | replace water damaged framing under exterior stairs & replace stair covering, replace water damaged framing for 1/f framing & re-install window flashing, relocate electrical main panel, relocate electrical sub panel inside basement flr, kitchen remodeling, add 2 new skylights in kitchen area.Details
replace water damaged framing under exterior stairs & replace stair covering, replace water damaged framing for 1/f framing & re-install window flashing, relocate electrical main panel, relocate electrical sub panel inside basement flr, kitchen remodeling, add 2 new skylights in kitchen area. | $30,000 |