Back to kitchen remodel contractors
Universal Construction Co
- Based in
- San Bruno
- On San Francisco permits
- Feb 2000 to Oct 2025
- Last 24 months
- 3 permits filed
55 permits since 2000: 31 completed, 24 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 438 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 30, 2009 | Completed final sign-off Jul 2010 | 125 Manchester St | remodel kitchen sheetrock cabinets, flooring. replace rear window and damaged framing not visible from street. replace same size and loction u factor .67 maxDetails
remodel kitchen sheetrock cabinets, flooring. replace rear window and damaged framing not visible from street. replace same size and loction u factor .67 max | $18,000 |
| Apr 9, 2003 | Expired or cancelled expired Feb 2010 | 2210 28th Av | replace extng cabinets new granite counter top,add plugs & lights,change sink. redirect kitchen ventDetails
replace extng cabinets new granite counter top,add plugs & lights,change sink. redirect kitchen vent | $2,100 |
| Jun 12, 2001 | Completed final sign-off Dec 2001 | 908 Filbert St | remodel kitchen change sub panel in bathrm, change cabinets & countertops;add insulationDetails
remodel kitchen change sub panel in bathrm, change cabinets & countertops;add insulation | $16,500 |
| Dec 27, 2000 | Expired or cancelled expired Apr 2001 | 1306 29th Av | remove kitchen cabinets, lath & plaster on walls, ceilings, concrete slab at (r) laundry rm. termitDetails
remove kitchen cabinets, lath & plaster on walls, ceilings, concrete slab at (r) laundry rm. termit | $1,300 |
| Sep 20, 2000 | Completed final sign-off Sep 2015 | 139 Colby St | remodel kitchen & bathrm, change windows & doors in kindDetails
remodel kitchen & bathrm, change windows & doors in kind | $46,300 |