Back to kitchen remodel contractors
United Mechanical Builder
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Mar 2010
- Last 24 months
- 0 permits filed
12 permits since 2000: 8 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 0 days from filing to permit and 108 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2010 | Completed final sign-off Jul 2010 | 337 Lisbon St | revision to pa# 2006.05.02.0421 shown as delta 1 dated 3/2/10 shown on plans; 1st fl: change utility rm to computer rm, 1/2 bath to full bathrm; 2nd fl: relocated kitchen and dining rm, change counter sink in master bath rm; 3rd fl: change guard rail for int. stair to full hgt of wall, new wet barDetails
revision to pa# 2006.05.02.0421 shown as delta 1 dated 3/2/10 shown on plans; 1st fl: change utility rm to computer rm, 1/2 bath to full bathrm; 2nd fl: relocated kitchen and dining rm, change counter sink in master bath rm; 3rd fl: change guard rail for int. stair to full hgt of wall, new wet bar | $5,000 |
| Jan 3, 2005 | Completed final sign-off Jan 2005 | 1282 23rd Av | comply with nov 200455371 to remove kitchen, stove, sink,shower, refrig, and counter at 1st flrDetails
comply with nov 200455371 to remove kitchen, stove, sink,shower, refrig, and counter at 1st flr | $5,000 |
| Jan 21, 2000 | Completed final sign-off Dec 2000 | 22 Bruce Av | remodel kitchen bathroom,interior & exterior painting, elec, plbg workDetails
remodel kitchen bathroom,interior & exterior painting, elec, plbg work |