Back to bathroom remodel contractors
Union Pacific Construction Inc
- Based in
- Petaluma
- On San Francisco permits
- Feb 2013 to Oct 2018
- Last 24 months
- 0 permits filed
20 permits since 2000: 11 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 7 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2018 | Completed final sign-off Dec 2019 | 2760 Sacramento St | unit 12. bathroom remodel - repair sheetrock, new tub, tile, electrical receptacles, switches, fans, paint, hook-up for plumbingDetails
unit 12. bathroom remodel - repair sheetrock, new tub, tile, electrical receptacles, switches, fans, paint, hook-up for plumbing | $32,500 |
| Mar 23, 2018 | Completed final sign-off Mar 2019 | 378 Highland Av | kitchen remodeleing, 2 bathroom, remodeling repairs, sheetrock cleanup , electrical plugs, switches, painting.Details
kitchen remodeleing, 2 bathroom, remodeling repairs, sheetrock cleanup , electrical plugs, switches, painting. | $60,000 |
| Dec 19, 2017 | Expired or cancelled expired Mar 2022 | 695 05th St | remodel downstairs bathroom and kitchen and bathroom upstairs. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. maher n/aDetails
remodel downstairs bathroom and kitchen and bathroom upstairs. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. maher n/a | $48,598 |
| Aug 29, 2017 | Completed final sign-off Dec 2017 | 622 Edna St | remodel bathroom, tub, sink, update of tub sink tile, flooring. no walls added or removed.Details
remodel bathroom, tub, sink, update of tub sink tile, flooring. no walls added or removed. | $25,000 |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 3632 26th St | apt #4: bathroom remodel, like for like. repair rotten deck.Details
apt #4: bathroom remodel, like for like. repair rotten deck. | $66,000 |
| Nov 29, 2016 | Completed final sign-off Jan 2017 | 2 Progress St | remodel bathroom, fix sheetrock, new tub, tile, hook up plumbing, switch out electrical plugs, switch and fan. paint new luncheon floor.Details
remodel bathroom, fix sheetrock, new tub, tile, hook up plumbing, switch out electrical plugs, switch and fan. paint new luncheon floor. | $20,000 |
| Oct 17, 2016 | Never finaled issued Oct 2016, no final | 414 Urbano Dr | installing new downstairs bathroom sink and tile. also installing new shower valve, plus sheetrock patching and paint.Details
installing new downstairs bathroom sink and tile. also installing new shower valve, plus sheetrock patching and paint. | $17,300 |