Back to kitchen remodel contractors
Ubaldo Aguilera Construction
- Based in
- Pleasanton,
- On San Francisco permits
- Jan 2022 to May 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 109 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2022 | Completed final sign-off May 2022 | 5264 03rd St | to comply with complaint #202286366. mitigation work due to water loss, affected drywall, insulation, base floor coverings. lower kitchen cabs, etc., to be removed and structure to be dried.Details
to comply with complaint #202286366. mitigation work due to water loss, affected drywall, insulation, base floor coverings. lower kitchen cabs, etc., to be removed and structure to be dried. | $10,000 |