Tycon Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2002 to Apr 2026
- Last 24 months
- 2 permits filed
48 permits since 2000: 40 completed, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 4 completed, 1 never finaled. Typically 594 days from filing to permit and 526 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 20, 2022 | Completed final sign-off Sep 2026 | 2266 43rd Av | 2nd fl kitchen renovation & new deck. new 3rd fl vertical addition. window replacement in-kind.Details
2nd fl kitchen renovation & new deck. new 3rd fl vertical addition. window replacement in-kind. | $350,000 |
| Dec 1, 2016 | Completed final sign-off Jan 2017 | 220 Vasquez Av | remove & replace dryrot/damaged mudsill approx 10'0" in garage , open/remove ceiling sheetrock on walls & kitchen ceiling for elelctrical work, rearrange existing closet layout, no structural work.Details
remove & replace dryrot/damaged mudsill approx 10'0" in garage , open/remove ceiling sheetrock on walls & kitchen ceiling for elelctrical work, rearrange existing closet layout, no structural work. | $13,000 |
| Mar 23, 2015 | Completed final sign-off Jun 2018 | 1425 Rivera St | horizontal extension only. adding one story back addition at the back of (e) house. no change of front facade. creating two bedroom and enlarge (e) kitchen/dining. convert (2) closets to a (n) bathroom on upper floor.Details
horizontal extension only. adding one story back addition at the back of (e) house. no change of front facade. creating two bedroom and enlarge (e) kitchen/dining. convert (2) closets to a (n) bathroom on upper floor. | $60,000 |
| Mar 22, 2012 | Never finaled issued Mar 2012, no final | 87 Madrone Av | remodel of (e) kitchen/breakfast area, replace (e) & install new windows & doors, replace (e) painted stucco exterior finsih, addition of 2nd floor rear deck, legalize (e) 1st floor w.c. (toilet).Details
remodel of (e) kitchen/breakfast area, replace (e) & install new windows & doors, replace (e) painted stucco exterior finsih, addition of 2nd floor rear deck, legalize (e) 1st floor w.c. (toilet). | $50,000 |
| Mar 24, 2005 | Completed final sign-off Jun 2008 | 1437 Rivera St | addition to rear & above (e) living rm & kitchen to includs electrical, plumbing, heating.Details
addition to rear & above (e) living rm & kitchen to includs electrical, plumbing, heating. | $130,000 |