Two Bricks Design Build
- Based in
- San Ramon
- On San Francisco permits
- May 2019 to Sep 2026
- Last 24 months
- 7 permits filed
17 permits since 2000: 8 completed, 9 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 in progress. Typically 416 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2025 | In progress issued Jan 2026 | 461 Pacific Av | exteiro work updating (e) storefront at 1st floor, replacing (e) stair from 3rd to roof with reconfigured stair enclosure, replacing roof deck at (e) roof, adding (n) windows on east facade of building within the same opening. remove rear fire escape and replace vertical ladders on front w/inclineDetails
exteiro work updating (e) storefront at 1st floor, replacing (e) stair from 3rd to roof with reconfigured stair enclosure, replacing roof deck at (e) roof, adding (n) windows on east facade of building within the same opening. remove rear fire escape and replace vertical ladders on front w/incline | $204,250 |
| Aug 2, 2022 | In progress issued Aug 2024 | 165 El Verano Wy | (n) 3rd story addition and roof deck. (n) 2nd story addition at north side yard.Details
(n) 3rd story addition and roof deck. (n) 2nd story addition at north side yard. | $150,000 |