Twin Shores Management Llc
- Based in
- East Moline
- On San Francisco permits
- Aug 2023 to Nov 2024
- Last 24 months
- 1 permit filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 in progress.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2024 | In progress filed Sep 2024, not yet issued | 285 Winston Dr | revision to 202308013403 changes include removal under stair storage room 114, removal of raised flooring for billiards 128 and 129. removal of ramp down to exit 5 from, raised florring, detail 1/a 302 updated to show existing existing fire door was installed. new overhead grille update to be 90 minDetails
revision to 202308013403 changes include removal under stair storage room 114, removal of raised flooring for billiards 128 and 129. removal of ramp down to exit 5 from, raised florring, detail 1/a 302 updated to show existing existing fire door was installed. new overhead grille update to be 90 min |