Permit GraphShortlistSan Francisco building permits since 2000

Tsomo Construction Inc

Contractor license
1042914
State license record
Based in
Oakland
On San Francisco permits
Aug 2019 to Mar 2026
Last 24 months
1 permit filed

4 permits since 2000: 3 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 3Bathroom remodel 1

3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 76 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 1, 2021Completed
final sign-off Feb 2022
50 Golden Gate Avunit #612:replace kitchen counter top cabinets,applicances,new floor,new vanity,paint entire unit(all interior work).to comply with 150.0 (k). no wall refonfiguration.
Details
Permit
202112013395
Status
complete
Filed
Dec 1, 2021
Permit issued
Dec 1, 2021
Final sign-off
Feb 15, 2022
Declared cost
$15,000
Address
50 Golden Gate Av

unit #612:replace kitchen counter top cabinets,applicances,new floor,new vanity,paint entire unit(all interior work).to comply with 150.0 (k). no wall refonfiguration.

Open the permit page

$15,000
Dec 1, 2021Completed
final sign-off Feb 2022
50 Golden Gate Avunit #608: replacing kitchen cabinets,appliances,new floor, new vanity,paint entire unit (only interior work). no wall reconfiguration. comply with 150.0 k.
Details
Permit
202112013394
Status
complete
Filed
Dec 1, 2021
Permit issued
Dec 1, 2021
Final sign-off
Feb 15, 2022
Declared cost
$15,000
Address
50 Golden Gate Av

unit #608: replacing kitchen cabinets,appliances,new floor, new vanity,paint entire unit (only interior work). no wall reconfiguration. comply with 150.0 k.

Open the permit page

$15,000
Aug 2, 2019Never finaled
issued Aug 2019, no final
855 Haight Stremodel kitchen (replace (e) cabinets), refinish hardwood floors, paint entire apt, replace 6 windows in the back (interior only and not visible from street).
Details
Permit
201908027721
Status
issued
Filed
Aug 2, 2019
Permit issued
Aug 2, 2019
Declared cost
$15,000
Address
855 Haight St

remodel kitchen (replace (e) cabinets), refinish hardwood floors, paint entire apt, replace 6 windows in the back (interior only and not visible from street).

Open the permit page

$15,000