Back to kitchen remodel contractors
Tsomo Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Aug 2019 to Mar 2026
- Last 24 months
- 1 permit filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2021 | Completed final sign-off Feb 2022 | 50 Golden Gate Av | unit #612:replace kitchen counter top cabinets,applicances,new floor,new vanity,paint entire unit(all interior work).to comply with 150.0 (k). no wall refonfiguration.Details
unit #612:replace kitchen counter top cabinets,applicances,new floor,new vanity,paint entire unit(all interior work).to comply with 150.0 (k). no wall refonfiguration. | $15,000 |
| Dec 1, 2021 | Completed final sign-off Feb 2022 | 50 Golden Gate Av | unit #608: replacing kitchen cabinets,appliances,new floor, new vanity,paint entire unit (only interior work). no wall reconfiguration. comply with 150.0 k.Details
unit #608: replacing kitchen cabinets,appliances,new floor, new vanity,paint entire unit (only interior work). no wall reconfiguration. comply with 150.0 k. | $15,000 |
| Aug 2, 2019 | Never finaled issued Aug 2019, no final | 855 Haight St | remodel kitchen (replace (e) cabinets), refinish hardwood floors, paint entire apt, replace 6 windows in the back (interior only and not visible from street).Details
remodel kitchen (replace (e) cabinets), refinish hardwood floors, paint entire apt, replace 6 windows in the back (interior only and not visible from street). | $15,000 |