Ts Construction
- Based in
- Pleasanton
- On San Francisco permits
- Dec 2023 to Dec 2023
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 97 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2023 | Completed final sign-off Aug 2024 | 250 King St | 1418: like for like kitchen, bath 1 & 2 remodel in condominium #1418. no structural change, interior only, no changes to floor plan. total aofw=280 sqft, pull and replace cabinetry, plumbing fixtures, appliances, update electrical receptacles, switches and lightning. no tile workDetails
1418: like for like kitchen, bath 1 & 2 remodel in condominium #1418. no structural change, interior only, no changes to floor plan. total aofw=280 sqft, pull and replace cabinetry, plumbing fixtures, appliances, update electrical receptacles, switches and lightning. no tile work | $40,000 |