Trush Construction Company Inc.
- Based in
- Sausalito
- On San Francisco permits
- Mar 2001 to Jan 2021
- Last 24 months
- 0 permits filed
39 permits since 2000: 33 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 9 days from filing to permit and 306 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2018 | Completed final sign-off Jul 2019 | 2419 44th Av | renovation of existing kitchen and bath. elec and mech upgrade. addition of new family rm and bath in gr fl voluntary seismic retrofit architectural grade aluminum windows with 2 casements for the front of the buildingDetails
renovation of existing kitchen and bath. elec and mech upgrade. addition of new family rm and bath in gr fl voluntary seismic retrofit architectural grade aluminum windows with 2 casements for the front of the building | $56,835 |
| Feb 6, 2012 | Never finaled issued Feb 2012, no final | 90 25th Av | remodel on all floors. 1st floor: add 95 sq ft conditioned space new rear door, new side windows. 2nd flr:relocate glazed door & wndw at rear.add wndw at powder room. 3rd floor: extended extg gurardrail to code, add new clear story window at master bath. 4th floor minor partition changes.Details
remodel on all floors. 1st floor: add 95 sq ft conditioned space new rear door, new side windows. 2nd flr:relocate glazed door & wndw at rear.add wndw at powder room. 3rd floor: extended extg gurardrail to code, add new clear story window at master bath. 4th floor minor partition changes. | $30,000 |
| Oct 20, 2011 | Completed final sign-off Jan 2013 | 90 25th Av | new windows /doors on ground floor, reconfigure front entrance, 6" widening of garage door. expand (e) deck at 2nd fl, reconfigure stair from deck to back yard. 1 new door replaces window at rear (2nd flr) & 1 new window replaces door (2nd flr) . new window at powder, new window at master bath.Details
new windows /doors on ground floor, reconfigure front entrance, 6" widening of garage door. expand (e) deck at 2nd fl, reconfigure stair from deck to back yard. 1 new door replaces window at rear (2nd flr) & 1 new window replaces door (2nd flr) . new window at powder, new window at master bath. | $40,000 |
| Oct 4, 2011 | Completed final sign-off Jan 2013 | 90 25th Av | interior renovation at ground fl. add shower to (e) 1/2 bath; 2nd fl: interior renovation incl.removal of wall and ad 1/2 bathrm; 3rd fl: minor change to bathrm/closet; 4th fl: eletrical workDetails
interior renovation at ground fl. add shower to (e) 1/2 bath; 2nd fl: interior renovation incl.removal of wall and ad 1/2 bathrm; 3rd fl: minor change to bathrm/closet; 4th fl: eletrical work | $80,000 |
| Jul 20, 2010 | Completed final sign-off Dec 2010 | 3201 Fillmore St | construction of two handicap access bathrooms (barrier removal) 1 - 3201; 1 - 3207Details
construction of two handicap access bathrooms (barrier removal) 1 - 3201; 1 - 3207 | $100,000 |