Back to kitchen remodel contractors
Trim Fit Constr. - O'reilly Engineering
- Based in
- San Bruno
- On San Francisco permits
- Jan 2000 to Feb 2024
- Last 24 months
- 0 permits filed
252 permits since 2000: 194 completed, 1 in progress, 31 never finaled, 26 expired or cancelled.
Of the 31 never-finaled permits, 5 are 3 to 5 years old, 15 are 5 to 10 years old, 11 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
50 kitchen remodel permits: 43 completed, 2 never finaled, 5 expired or cancelled. Typically 0 days from filing to permit and 63 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2024 | Completed final sign-off Nov 2024 | 114 Granville Wy | remodel extg kitchen, laundry, and bedroom closet.Details
remodel extg kitchen, laundry, and bedroom closet. | $75,000 |
| Aug 7, 2023 | Expired or cancelled withdrawn Aug 2023 | 711 47th Av | revision: bpa: 202306150167: no can lights, no widen of door way as showing on plans in kitchen.Details
revision: bpa: 202306150167: no can lights, no widen of door way as showing on plans in kitchen. | |
| Jun 15, 2023 | Completed final sign-off Aug 2023 | 711 47th Av | at 2nd floor, remodel existing kitchenDetails
at 2nd floor, remodel existing kitchen | $20,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 110 06th Av | unit 5:demo kitchen remodel one kitchen and one bath replace cabinets in kind: new kitchen floor new bathroom fixtures paintDetails
unit 5:demo kitchen remodel one kitchen and one bath replace cabinets in kind: new kitchen floor new bathroom fixtures paint | $28,000 |
| Apr 25, 2022 | Never finaled issued Apr 2022, no final | 1964 Post St | unit # 7, #10, #11: interior remodel. move kitchens & convert into bedrooms. no changes to exterior.Details
unit # 7, #10, #11: interior remodel. move kitchens & convert into bedrooms. no changes to exterior. | $83,131 |
| Feb 28, 2022 | Completed final sign-off May 2022 | 1677 Bush St | units 7,14,21: interior remodel to move kitchens and convert to bedrooms. no change to exterior.Details
units 7,14,21: interior remodel to move kitchens and convert to bedrooms. no change to exterior. | $44,525 |
| Mar 31, 2021 | Completed final sign-off Jul 2021 | 1478 Grove St | bathroom & kitchen remodel, in-kind. no structural. paint & refinish floors. no wall mods. plumbing and eletrical under sep permits.Details
bathroom & kitchen remodel, in-kind. no structural. paint & refinish floors. no wall mods. plumbing and eletrical under sep permits. | $49,000 |
| Feb 25, 2021 | Completed final sign-off Jun 2021 | 731 08th Av | 2nd fl. remove (e) bearing wall between kitchen and dining room, install new kitchen island and closet, replace (e) fire places w/new gas fire placeDetails
2nd fl. remove (e) bearing wall between kitchen and dining room, install new kitchen island and closet, replace (e) fire places w/new gas fire place | $15,000 |
| Feb 11, 2020 | Completed final sign-off May 2020 | 704 Bush St | kitchen remodel at unit #402, #406, and #210: replace in-kind of cabinet, sink and refinish flooring. each kitchen area approx. 50 sq.ft. no new wall and no existing wall relocation. no lighting work.Details
kitchen remodel at unit #402, #406, and #210: replace in-kind of cabinet, sink and refinish flooring. each kitchen area approx. 50 sq.ft. no new wall and no existing wall relocation. no lighting work. | $21,000 |
| Aug 23, 2019 | Completed final sign-off Nov 2019 | 517 23rd Av | replace kitchen cabinets. new granite counter tops replace in kind 80 sq ft full kitchen remodelDetails
replace kitchen cabinets. new granite counter tops replace in kind 80 sq ft full kitchen remodel | $20,000 |
| Feb 15, 2019 | Completed final sign-off Mar 2019 | 945 Larkin St | unit # 44 -kitchen replace cabinets new counter tops paint replace in kindDetails
unit # 44 -kitchen replace cabinets new counter tops paint replace in kind | $10,000 |
| Feb 15, 2019 | Completed final sign-off Apr 2019 | 430 Castro St | unit # 2-demo of kitchen ( 10x10) bathroom (6x6) replace in kind new tile paintDetails
unit # 2-demo of kitchen ( 10x10) bathroom (6x6) replace in kind new tile paint | $25,000 |
| Dec 10, 2018 | Completed final sign-off Feb 2019 | 1655 24th Av | remodel of (1) kitchen new cabinets and counter tops no changes. new tile in (1) bathroom new fixtures no changes.Details
remodel of (1) kitchen new cabinets and counter tops no changes. new tile in (1) bathroom new fixtures no changes. | $20,000 |
| Nov 9, 2018 | Completed final sign-off Dec 2018 | 945 Larkin St | #34: remodel kitchen, new cabinets, new granite. 40 sq ft. same location no change.Details
#34: remodel kitchen, new cabinets, new granite. 40 sq ft. same location no change. | $10,000 |
| Mar 8, 2018 | Completed final sign-off Apr 2018 | 56 Camp St | remove and replace kitchen cabinets, new granite, new tile and fixtures in bathroom. no structural. no wall modification.Details
remove and replace kitchen cabinets, new granite, new tile and fixtures in bathroom. no structural. no wall modification. | $28,000 |
| Feb 12, 2018 | Completed final sign-off Jun 2018 | 2034 47th Av | revision to pa #201712297643. add windows, handrail, and balcony to original approved plans. wood-clad aluminum windows in kitchen & living room. kichen : double hung, living room - double hung on left & right with picture window in center. balcony is metal and handrail is metal.Details
revision to pa #201712297643. add windows, handrail, and balcony to original approved plans. wood-clad aluminum windows in kitchen & living room. kichen : double hung, living room - double hung on left & right with picture window in center. balcony is metal and handrail is metal. | |
| Jan 22, 2018 | Completed final sign-off Mar 2018 | 3424 21st St | remodel unit a new kitchen cabinets, new tile in bathroom, new counter topDetails
remodel unit a new kitchen cabinets, new tile in bathroom, new counter top | $25,000 |
| Dec 29, 2017 | Completed final sign-off Jun 2018 | 2034 47th Av | kitchen remodel. remove wall between extg kitchen and living room.Details
kitchen remodel. remove wall between extg kitchen and living room. | $10,000 |
| Dec 1, 2017 | Completed final sign-off Mar 2018 | 3085 Harrison St | to comply nov 201545251. 1/f: remodel for (n) laundry room & bike rack. new wall mounted water heaters (3). 2/f: remodel (e) kitchen & new bathroom. 3/f: remodel unit #2 kitchen, at unit #3, remodel (e) kitchen to bedroom, and relocate kitchen to living. replace vinyl windows w/ alum-clad wd.Details
to comply nov 201545251. 1/f: remodel for (n) laundry room & bike rack. new wall mounted water heaters (3). 2/f: remodel (e) kitchen & new bathroom. 3/f: remodel unit #2 kitchen, at unit #3, remodel (e) kitchen to bedroom, and relocate kitchen to living. replace vinyl windows w/ alum-clad wd. | $45,000 |
| Nov 3, 2017 | Completed final sign-off Jan 2018 | 945 Larkin St | #42: demo of (1) kitchen & (1) bathroom, new cabinets, new counter tops. new bathroom fixtures, new tile. no alteration of wall, window and door. maher naDetails
#42: demo of (1) kitchen & (1) bathroom, new cabinets, new counter tops. new bathroom fixtures, new tile. no alteration of wall, window and door. maher na | $20,000 |
| Nov 3, 2017 | Completed final sign-off Jan 2018 | 945 Larkin St | #52: demo of (1) kitchen & (1) bathroom, new cabinets, new counter tops. new bathroom fixtures, new tile. no alteration of wall, window and door. maher naDetails
#52: demo of (1) kitchen & (1) bathroom, new cabinets, new counter tops. new bathroom fixtures, new tile. no alteration of wall, window and door. maher na | $20,000 |
| Oct 4, 2017 | Completed final sign-off Nov 2017 | 945 Larkin St | #12: remodel unit kitchen, new cabinets, new counter top. no changes to wall locations.Details
#12: remodel unit kitchen, new cabinets, new counter top. no changes to wall locations. | $6,000 |
| Sep 6, 2017 | Expired or cancelled cancelled Jan 2026 | 191 Andover St | remodel existing kitchen, remove flue, no structural walls removed. (pa 2017-0804-3928 is for only 193 andover)Details
remodel existing kitchen, remove flue, no structural walls removed. (pa 2017-0804-3928 is for only 193 andover) | $15,250 |
| Aug 4, 2017 | Completed final sign-off Oct 2017 | 191 Andover St | remodel extg kitchen, new bathroom, install beam beam between kitchen and dining room.Details
remodel extg kitchen, new bathroom, install beam beam between kitchen and dining room. | $39,500 |
| Jun 23, 2017 | Completed final sign-off Aug 2017 | 1583 32nd Av | 2nd floor - remodel (e) bathroom & kitchen. add new bathroom and closet for master bedroom; infill in lightwellDetails
2nd floor - remodel (e) bathroom & kitchen. add new bathroom and closet for master bedroom; infill in lightwell | $30,000 |
| May 31, 2017 | Completed final sign-off Jul 2017 | 1871 43rd Av | kitchen remodel with new cabinets, counters, update electrical & plumbing by others.Details
kitchen remodel with new cabinets, counters, update electrical & plumbing by others. | $8,000 |
| May 10, 2016 | Completed final sign-off Jun 2016 | 1251 Waller St | remodel extg bathroom and change kitchen counter tops.Details
remodel extg bathroom and change kitchen counter tops. | $10,000 |
| Apr 29, 2016 | Completed final sign-off May 2016 | 895 Noe St | prior to completion of work under pa 2015-0114-5767 - kitchen location was changed per drawings. no structural walls removedDetails
prior to completion of work under pa 2015-0114-5767 - kitchen location was changed per drawings. no structural walls removed | |
| Jan 14, 2015 | Completed final sign-off May 2016 | 895 Noe St | remodel & enlarge basement to create new living unit w/ kitchen & bath. new dormer at top floorDetails
remodel & enlarge basement to create new living unit w/ kitchen & bath. new dormer at top floor | $155,000 |
| Jan 9, 2015 | Completed final sign-off May 2015 | 71 Cotter St | 1st floor -new footing and post; 2nd floor-remove walls and remodel kitchen and bath; 3rd floor- remodel bath and new closet.Details
1st floor -new footing and post; 2nd floor-remove walls and remodel kitchen and bath; 3rd floor- remodel bath and new closet. | $56,000 |
| Dec 15, 2014 | Completed final sign-off Jan 2015 | 945 Larkin St | work in unit #22: kitchen and bathroom rmodel: all fixtures to remain in (e) locations. no structural work. electrical & plumbing by separate permit. no change on walls.Details
work in unit #22: kitchen and bathroom rmodel: all fixtures to remain in (e) locations. no structural work. electrical & plumbing by separate permit. no change on walls. | $15,000 |
| Nov 24, 2014 | Completed final sign-off May 2016 | 895 Noe St | renovation, remodel of (e) house including (n) attic stair , remodel of kitchen, master bedroom & bathrooms, (n) walk-in closet, roofing repair & (n) flat skylights, (n) windows @ rear. (n) electrical, plumbing & mech. work by separate permits. (n) residential sprinkler system by separate permitDetails
renovation, remodel of (e) house including (n) attic stair , remodel of kitchen, master bedroom & bathrooms, (n) walk-in closet, roofing repair & (n) flat skylights, (n) windows @ rear. (n) electrical, plumbing & mech. work by separate permits. (n) residential sprinkler system by separate permit | $175,000 |
| Nov 18, 2014 | Never finaled issued Nov 2014, no final | 895 Noe St | remodel kitchen & 1/2 bath/laundry @ 1st flr, remodel bathroom @ 2nd flr, no structural changes, plumbing & elec by separate permit.Details
remodel kitchen & 1/2 bath/laundry @ 1st flr, remodel bathroom @ 2nd flr, no structural changes, plumbing & elec by separate permit. | $33,000 |
| Aug 22, 2014 | Completed final sign-off Sep 2014 | 2059 22nd Av | renovation/remodel of residence, including remodel of kitchen, bath and shower. install new hallway wall. check and repair dry rot at rear windows. install anchor bolts, per plan.Details
renovation/remodel of residence, including remodel of kitchen, bath and shower. install new hallway wall. check and repair dry rot at rear windows. install anchor bolts, per plan. | $30,000 |
| Jun 18, 2014 | Completed final sign-off Aug 2018 | 4608 03rd St | change of use of grocery to full restaurant. work includes ada upgrades, storefront repair/replacement, (n) kitchen, 2 (n) restrooms, (n) storage/mop area & (n) exhaust & heating.Details
change of use of grocery to full restaurant. work includes ada upgrades, storefront repair/replacement, (n) kitchen, 2 (n) restrooms, (n) storage/mop area & (n) exhaust & heating. | $50,000 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 1326 Quesada Av | remodel existing two unit building, in-fill interior lightwell, add a new bathroom in each unit. replace windows. remodel kitchens and existing bathrooms. install a moment frame at the front part of building.Details
remodel existing two unit building, in-fill interior lightwell, add a new bathroom in each unit. replace windows. remodel kitchens and existing bathrooms. install a moment frame at the front part of building. | $175,000 |
| Jun 13, 2014 | Completed final sign-off Oct 2014 | 517 29th St | remodel @ basement level kitchen, new cabinets & island, new lighting throughout area. infill @ oone grnd level window @ rear elevation. infill of floor framing @ 1st flr interior, new restroom @ 1st flrDetails
remodel @ basement level kitchen, new cabinets & island, new lighting throughout area. infill @ oone grnd level window @ rear elevation. infill of floor framing @ 1st flr interior, new restroom @ 1st flr | $30,000 |
| May 22, 2014 | Completed final sign-off Oct 2014 | 2144 Hayes St | 3/f- convert (e) closet to bathroom, install 2 skylights. 2/f- remodel (e) kitchen & bathroom. build new landing and stair at rear.Details
3/f- convert (e) closet to bathroom, install 2 skylights. 2/f- remodel (e) kitchen & bathroom. build new landing and stair at rear. | $75,000 |
| May 21, 2014 | Completed final sign-off Oct 2014 | 1326 Quesada Av | remove kitchen cabinets (2), (6) bath cabinets, & (2) fixtures, remove sheetrock & flooringDetails
remove kitchen cabinets (2), (6) bath cabinets, & (2) fixtures, remove sheetrock & flooring | $5,000 |
| Sep 3, 2013 | Completed final sign-off Nov 2013 | 1940 23rd Av | at 1st floor, new bathroom, bedroom, family and home offices and laundry. at 2nd floor remodel extg kitchen and bathroom.Details
at 1st floor, new bathroom, bedroom, family and home offices and laundry. at 2nd floor remodel extg kitchen and bathroom. | $50,000 |
| Jun 26, 2013 | Completed final sign-off Jul 2013 | 1117 Market St | tenant improvement to 2nd floor including suspended ceiling modifications, kitchen, electrical outlets & re-arrangement of existing mechanicla & lighting.Details
tenant improvement to 2nd floor including suspended ceiling modifications, kitchen, electrical outlets & re-arrangement of existing mechanicla & lighting. | $40,000 |
| Nov 14, 2012 | Completed final sign-off Aug 2013 | 62 Ina Ct | remodel kitchen, living room & dining room. install new beam. replace (e) windows & doors at rear wall in existing openings, replace guardrail at stairs.Details
remodel kitchen, living room & dining room. install new beam. replace (e) windows & doors at rear wall in existing openings, replace guardrail at stairs. | $14,000 |
| Jun 13, 2012 | Completed final sign-off Oct 2012 | 145 Gardenside Dr | remove (e) bearing walls (site verified) and remodel (e) kitchen. remove bottom 3 steps to create a 36"x36" landing and turn 2 steps. (6'-8" clear headroom min). (n) guardral to replace (e) (n) fireplace facade to repalce (e). plumbing and electrical by separate permit.Details
remove (e) bearing walls (site verified) and remodel (e) kitchen. remove bottom 3 steps to create a 36"x36" landing and turn 2 steps. (6'-8" clear headroom min). (n) guardral to replace (e) (n) fireplace facade to repalce (e). plumbing and electrical by separate permit. | $18,000 |
| Mar 23, 2012 | Completed final sign-off Apr 2012 | 145 Gardenside Dr | reduce height of (small opening) in non bearing wall between kitchen/living room & build partitoin wall around stacked washer and dryer. plumbing and elec by separate permit.Details
reduce height of (small opening) in non bearing wall between kitchen/living room & build partitoin wall around stacked washer and dryer. plumbing and elec by separate permit. | $1,600 |
| Nov 19, 2009 | Completed final sign-off Jan 2010 | 1451 Haight St | remodel kitchen counter cabinet and floor tile @1451 a unit, no new lightDetails
remodel kitchen counter cabinet and floor tile @1451 a unit, no new light | $5,200 |
| May 14, 2009 | Completed final sign-off Jul 2009 | 430 Crescent Av | remodel kitchen & bath. no strutural walls removed. new cabinets, countertops & vanity. new sink, dishwasher & faucet, men toilet, new mirror in bathroom, new lighting -by separate permit.Details
remodel kitchen & bath. no strutural walls removed. new cabinets, countertops & vanity. new sink, dishwasher & faucet, men toilet, new mirror in bathroom, new lighting -by separate permit. | $35,000 |
| Apr 25, 2003 | Expired or cancelled expired Dec 2004 | 766 Sutter St | remodel new kitchens new tile in bathrooms & kitchens. unit#16,21,23,59,33,49,38 no structural changDetails
remodel new kitchens new tile in bathrooms & kitchens. unit#16,21,23,59,33,49,38 no structural chang | $70,000 |
| Feb 7, 2003 | Expired or cancelled expired Dec 2004 | 766 Sutter St | new kitchens new tile in bathrooms & kitchens unit#12,15,18,24,25,28,37,44,42,47,54,56,57.no structuDetails
new kitchens new tile in bathrooms & kitchens unit#12,15,18,24,25,28,37,44,42,47,54,56,57.no structu | $100,000 |
| Dec 7, 2001 | Expired or cancelled expired Apr 2002 | 575 07th Av | repair dry rot floor, repair kitchen sink and counter top, repair section of missing ceiling, complyDetails
repair dry rot floor, repair kitchen sink and counter top, repair section of missing ceiling, comply | $800 |
| Sep 27, 2000 | Completed final sign-off Nov 2000 | 1378 Waller St | replace kitchen cabinets,countertop,sheetrock at back roomDetails
replace kitchen cabinets,countertop,sheetrock at back room | $12,500 |