Tri-Star Home Improvement Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Mar 2025
- Last 24 months
- 3 permits filed
72 permits since 2000: 63 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 5 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2025 | Completed final sign-off Dec 2025 | 32 Nebraska St | 1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor.Details
1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor. | $150,000 |
| Jun 1, 2022 | Completed final sign-off May 2023 | 176 Bocana St | interior remodel, add front facade decorative details, remove canopy and wall around front entrance, replae 3 front windows with aluminum clad wood windows in-kind, add 2nd floor rear deck, add new rear windows not visible from street; add 1 bath & powder roomDetails
interior remodel, add front facade decorative details, remove canopy and wall around front entrance, replae 3 front windows with aluminum clad wood windows in-kind, add 2nd floor rear deck, add new rear windows not visible from street; add 1 bath & powder room | $380,000 |
| Jul 20, 2017 | Completed final sign-off Jan 2018 | 1490 Shafter Av | remodel (e) kitchen & bathrm, add (1) new full bath & (1) half bath, rear deck at 2nd fl. new bedrm with bath, and media rm to be constructed at ground fl.Details
remodel (e) kitchen & bathrm, add (1) new full bath & (1) half bath, rear deck at 2nd fl. new bedrm with bath, and media rm to be constructed at ground fl. | $90,000 |
| May 23, 2012 | Completed final sign-off Aug 2012 | 1625 Palou Av | remodel (e) bathroom, add 1 storage room within (e) family room at ground floor. construct new deck with stair at 2nd floor attached to rear of (e) buildingDetails
remodel (e) bathroom, add 1 storage room within (e) family room at ground floor. construct new deck with stair at 2nd floor attached to rear of (e) building | $28,000 |
| Mar 28, 2012 | Completed final sign-off Apr 2012 | 279 Montana St | revision to approved pa# 201112190894 to eliminate rear deck stair and change location of exterior rear stair from left to right.Details
revision to approved pa# 201112190894 to eliminate rear deck stair and change location of exterior rear stair from left to right. | |
| Dec 19, 2011 | Completed final sign-off Apr 2012 | 279 Montana St | at 2nd fl construct non bearing walls, convert e study to new bath and remodel e kitchen. at 1st floor construct non bearing walls at garage, new bath, convert e family room to bedrooms, new laundry. at basement new walls for bedroom. new furnace and water heater. new wood deck & new interior stairDetails
at 2nd fl construct non bearing walls, convert e study to new bath and remodel e kitchen. at 1st floor construct non bearing walls at garage, new bath, convert e family room to bedrooms, new laundry. at basement new walls for bedroom. new furnace and water heater. new wood deck & new interior stair | $38,000 |