Back to bathroom remodel contractors
Tri-Star Home Improvement Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to Mar 2025
- Last 24 months
- 3 permits filed
72 permits since 2000: 63 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
32 bathroom remodel permits: 31 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2025 | Completed final sign-off Dec 2025 | 32 Nebraska St | 1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor.Details
1) 645 new condition space on 1st floor. add 2 bathrooms, 2 bedrooms and media room. 2)relocate 2 bath on 2nd floor, remodel kitchen, reduce deck at rear and add stairs connecting 1st and 2nd floor. | $150,000 |
| Jun 1, 2022 | Completed final sign-off May 2023 | 176 Bocana St | interior remodel, add front facade decorative details, remove canopy and wall around front entrance, replae 3 front windows with aluminum clad wood windows in-kind, add 2nd floor rear deck, add new rear windows not visible from street; add 1 bath & powder roomDetails
interior remodel, add front facade decorative details, remove canopy and wall around front entrance, replae 3 front windows with aluminum clad wood windows in-kind, add 2nd floor rear deck, add new rear windows not visible from street; add 1 bath & powder room | $380,000 |
| Mar 2, 2022 | Expired or cancelled expired Mar 2025 | 320 Day St | remodel existing kitchen and bathroom. no structural work.Details
remodel existing kitchen and bathroom. no structural work. | $35,000 |
| May 14, 2018 | Completed final sign-off Aug 2018 | 236 Holladay Av | remodel (e) kitchen and (2) bathrooms. repair siding(approx. 400 sq.ft.) and replacement of (2) windows in rear. u-factor 0.32 max. n/a maherDetails
remodel (e) kitchen and (2) bathrooms. repair siding(approx. 400 sq.ft.) and replacement of (2) windows in rear. u-factor 0.32 max. n/a maher | $50,000 |
| Feb 23, 2018 | Completed final sign-off May 2019 | 879 Capp St | residential interior remodel on 2nd & 3rd flr. addition of habitable space on ground flr (e) garage, all work linited to within (e) bld enevelope. 3rd flr add 1 bathroom, 2nd flr - no change, grnd flr - add 1 bath and 1 bedroom. structural stregthening, 5 new window totalDetails
residential interior remodel on 2nd & 3rd flr. addition of habitable space on ground flr (e) garage, all work linited to within (e) bld enevelope. 3rd flr add 1 bathroom, 2nd flr - no change, grnd flr - add 1 bath and 1 bedroom. structural stregthening, 5 new window total | $80,000 |
| Oct 31, 2017 | Completed final sign-off Apr 2018 | 60 Hale St | remodel kitchen, remodel one bath at first floor. add a bedroom at ground floor, remodel family room at ground floor. add a bath at grould floor, no exterior.Details
remodel kitchen, remodel one bath at first floor. add a bedroom at ground floor, remodel family room at ground floor. add a bath at grould floor, no exterior. | $40,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 1490 Shafter Av | revision to approved application #201707202531 to relocate new bath at ground floor (previously approved ) and reconfigure plan layout for new bath and powder room at 2nd floor per plan.Details
revision to approved application #201707202531 to relocate new bath at ground floor (previously approved ) and reconfigure plan layout for new bath and powder room at 2nd floor per plan. | $1,000 |
| Jul 20, 2017 | Completed final sign-off Jan 2018 | 1490 Shafter Av | remodel (e) kitchen & bathrm, add (1) new full bath & (1) half bath, rear deck at 2nd fl. new bedrm with bath, and media rm to be constructed at ground fl.Details
remodel (e) kitchen & bathrm, add (1) new full bath & (1) half bath, rear deck at 2nd fl. new bedrm with bath, and media rm to be constructed at ground fl. | $90,000 |
| Jun 16, 2017 | Completed final sign-off Jun 2021 | 579 Clipper St | remodel 2 story sfr to 3rd story sfr. with 3 rd floor addition to include 3 bedrms, 2 baths.Details
remodel 2 story sfr to 3rd story sfr. with 3 rd floor addition to include 3 bedrms, 2 baths. | $550,000 |
| Oct 28, 2016 | Completed final sign-off Jun 2017 | 1129 Mendell St | remodel (e) kitchen & bathroom, convert (e) closet to new bath, replace (e) rear windows in kind.Details
remodel (e) kitchen & bathroom, convert (e) closet to new bath, replace (e) rear windows in kind. | $26,000 |
| Feb 12, 2016 | Completed final sign-off Feb 2017 | 1574 Shafter Av | 1)comply with nov #201523941 and 199706336(task force inspection). 2)1st floor: add one bedroom, family room and bathroom. 3)2nd fl: remodel kitchen, bathroom and add one bath room. 4)3rd fl: remodel bath room. building is currently vacantDetails
1)comply with nov #201523941 and 199706336(task force inspection). 2)1st floor: add one bedroom, family room and bathroom. 3)2nd fl: remodel kitchen, bathroom and add one bath room. 4)3rd fl: remodel bath room. building is currently vacant | $76,300 |
| Jan 16, 2014 | Completed final sign-off Apr 2014 | 1408 Shafter Av | add bathroom on second floor. convert existing storage to family and bedroom on first floor. add bathroom on first floor. repair foundation.Details
add bathroom on second floor. convert existing storage to family and bedroom on first floor. add bathroom on first floor. repair foundation. | $39,000 |
| Sep 27, 2013 | Completed final sign-off Jul 2016 | 32 Gaven St | add one 1/2 bath room and study room within family room at ground floor per plan.Details
add one 1/2 bath room and study room within family room at ground floor per plan. | $23,000 |
| Jun 13, 2013 | Completed final sign-off Dec 2015 | 38 Carr St | legalize bedrooms, family rooms, laundry and baths on the 1st and 2nd floor. change bid room to one bedroom and family rm in 3rd floor. comply nov #200799935. complaint #200668765. finalize #397642/443589Details
legalize bedrooms, family rooms, laundry and baths on the 1st and 2nd floor. change bid room to one bedroom and family rm in 3rd floor. comply nov #200799935. complaint #200668765. finalize #397642/443589 | $30,000 |
| Jun 13, 2013 | Completed final sign-off Dec 2013 | 1395 Shafter Av | legalize bedrooms, family room, laundry, baths per plan.Details
legalize bedrooms, family room, laundry, baths per plan. | $20,000 |
| Apr 11, 2013 | Completed final sign-off Jul 2013 | 1526 Palou Av | in compliance of nov 201384073, 201383782 and 201384393 to legalize (e) bedroom, family room, and bathroom at ground floor per plan. remodel (e) bathroom at 3rd floor. remodel (e) kitchen and bathroom at 2nd floor.Details
in compliance of nov 201384073, 201383782 and 201384393 to legalize (e) bedroom, family room, and bathroom at ground floor per plan. remodel (e) bathroom at 3rd floor. remodel (e) kitchen and bathroom at 2nd floor. | $30,000 |
| Sep 19, 2012 | Completed final sign-off Feb 2013 | 2035 Oakdale Av | revision to approved bpa#201207316098. a) relocate bathroom at 2nd floor per plan and add lightwell. b) relocate interior door at ground floor.Details
revision to approved bpa#201207316098. a) relocate bathroom at 2nd floor per plan and add lightwell. b) relocate interior door at ground floor. | $8,000 |
| Jul 31, 2012 | Completed final sign-off Mar 2013 | 1963 Oakdale Av | remodel bathroom, kitchen in second floor. alteration work in ground floor per plan including 3 bedrooms, 2 baths, 1 family room. repair (e) front stairs.Details
remodel bathroom, kitchen in second floor. alteration work in ground floor per plan including 3 bedrooms, 2 baths, 1 family room. repair (e) front stairs. | $20,000 |
| May 23, 2012 | Completed final sign-off Aug 2012 | 1625 Palou Av | remodel (e) bathroom, add 1 storage room within (e) family room at ground floor. construct new deck with stair at 2nd floor attached to rear of (e) buildingDetails
remodel (e) bathroom, add 1 storage room within (e) family room at ground floor. construct new deck with stair at 2nd floor attached to rear of (e) building | $28,000 |
| Apr 20, 2012 | Completed final sign-off Mar 2013 | 1351 Revere Av | legalize 3 bedrooms,family room, laundry room, baths on the ground floor. 2 baths on the 2nd floor per plan.Details
legalize 3 bedrooms,family room, laundry room, baths on the ground floor. 2 baths on the 2nd floor per plan. | $30,000 |
| Apr 20, 2012 | Completed final sign-off Jan 2013 | 1279 Revere Av | legalize 2 bedroom, 1 family room, 1 bath on the ground floor and 1 bath on the 2nd floor per plan.Details
legalize 2 bedroom, 1 family room, 1 bath on the ground floor and 1 bath on the 2nd floor per plan. | $20,000 |
| Mar 28, 2012 | Completed final sign-off Aug 2012 | 1625 Palou Av | remodel kitchen and 2 bathrooms on 2/fDetails
remodel kitchen and 2 bathrooms on 2/f | $15,000 |
| Feb 13, 2012 | Completed final sign-off Apr 2012 | 231 Thornton Av | legalize 2 bedrooms, 1 bath, 1 storage on the ground floor and add 1 bath on the 3rd floor per plan.Details
legalize 2 bedrooms, 1 bath, 1 storage on the ground floor and add 1 bath on the 3rd floor per plan. | $20,000 |
| Dec 19, 2011 | Completed final sign-off Apr 2012 | 279 Montana St | at 2nd fl construct non bearing walls, convert e study to new bath and remodel e kitchen. at 1st floor construct non bearing walls at garage, new bath, convert e family room to bedrooms, new laundry. at basement new walls for bedroom. new furnace and water heater. new wood deck & new interior stairDetails
at 2nd fl construct non bearing walls, convert e study to new bath and remodel e kitchen. at 1st floor construct non bearing walls at garage, new bath, convert e family room to bedrooms, new laundry. at basement new walls for bedroom. new furnace and water heater. new wood deck & new interior stair | $38,000 |
| Dec 16, 2011 | Completed final sign-off Dec 2012 | 1290 Shafter Av | legalize family room, 1 bathroom, laundry room & 2 bedroom on the ground floor. legalize 1 bathroom on 2nd floor per plan. repair dry rot & garage door. replace like kind windowsDetails
legalize family room, 1 bathroom, laundry room & 2 bedroom on the ground floor. legalize 1 bathroom on 2nd floor per plan. repair dry rot & garage door. replace like kind windows | $30,000 |
| Oct 27, 2011 | Completed final sign-off Aug 2012 | 1187 Palou Av | legalize 3 bedrooms, 1 bath and laundry room on the ground floor per plan. repair dryrot for siding stairs. replace like-kind windows.Details
legalize 3 bedrooms, 1 bath and laundry room on the ground floor per plan. repair dryrot for siding stairs. replace like-kind windows. | $30,000 |
| Oct 6, 2011 | Completed final sign-off Jan 2012 | 1466 Revere Av | 1 new bathroom, storage room, 2 bedrooms to be constructed at ground floor plan per planDetails
1 new bathroom, storage room, 2 bedrooms to be constructed at ground floor plan per plan | $35,000 |
| Sep 23, 2011 | Completed final sign-off Nov 2011 | 718 Mendell St | to comply with nov# 201159288 dated 9/20/2011 - remodel kitchen and 2 bathrooms, replace 4 rear windows, interior paint and repair dryrot of siding.Details
to comply with nov# 201159288 dated 9/20/2011 - remodel kitchen and 2 bathrooms, replace 4 rear windows, interior paint and repair dryrot of siding. | $25,000 |
| Apr 11, 2011 | Completed final sign-off Jun 2011 | 318 Lakeview Av | remodel kitchen & 2 bathrooms. replace cabinets, coutner top and flooring tile in kitchen. replace toilet, tile in bathroom. interior and exterior paint.Details
remodel kitchen & 2 bathrooms. replace cabinets, coutner top and flooring tile in kitchen. replace toilet, tile in bathroom. interior and exterior paint. | $8,500 |
| Aug 10, 2010 | Completed final sign-off Nov 2010 | 1543 Innes Av | add rooms (2 bedroms, 2 bathrooms at ground floor area=394.75 sq ft. 2nd floor interior painting & exterior paintingDetails
add rooms (2 bedroms, 2 bathrooms at ground floor area=394.75 sq ft. 2nd floor interior painting & exterior painting | $20,000 |
| Sep 16, 2009 | Completed final sign-off Nov 2009 | 25 Francis St | work @ #25 francis st. one study, 1 office & two half bathrooms to be constructed at ground floor.Details
work @ #25 francis st. one study, 1 office & two half bathrooms to be constructed at ground floor. | $40,000 |
| Aug 19, 2009 | Completed final sign-off Aug 2010 | 20 Morningside Dr | two new bedrooms, one full bath room, family rm at ground/garage level. replace (e) wood beam and posts at ground floor.Details
two new bedrooms, one full bath room, family rm at ground/garage level. replace (e) wood beam and posts at ground floor. | $40,000 |