Back to bathroom remodel contractors
Traube Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Jun 2026
- Last 24 months
- 2 permits filed
94 permits since 2000: 81 completed, 3 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 40 completed, 1 in progress, 4 never finaled. Typically 2 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2026 | In progress issued Jun 2026 | 823 Divisadero St | unit 1 remodel kitchen like for like, unit 2 remodel kitchen and bathroom like for like. no conversions. in kind.Details
unit 1 remodel kitchen like for like, unit 2 remodel kitchen and bathroom like for like. no conversions. in kind. | $28,000 |
| Dec 21, 2023 | Completed final sign-off Mar 2025 | 437 40th Av | remodel bathroom and water closet at second floor.Details
remodel bathroom and water closet at second floor. | $36,000 |
| Nov 3, 2022 | Completed final sign-off Mar 2025 | 437 40th Av | convert portion of garage on first fl. into habitable space to include new bedrooms, family room, bath room, powder and laundry room - infill under existing room built on stiltsDetails
convert portion of garage on first fl. into habitable space to include new bedrooms, family room, bath room, powder and laundry room - infill under existing room built on stilts | $111,000 |
| Oct 3, 2022 | Completed final sign-off Dec 2022 | 179 Rome St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $26,500 |
| Mar 23, 2021 | Never finaled issued Mar 2021, no final | 1260 11th Av | remodel (1) bathroom in-kind, no layout change/no wall demolitionDetails
remodel (1) bathroom in-kind, no layout change/no wall demolition | $3,500 |
| Mar 23, 2021 | Completed final sign-off May 2021 | 674 07th Av | remodel (e) bathroom in-kind w/shower pan, no layout change/no wall demolitionDetails
remodel (e) bathroom in-kind w/shower pan, no layout change/no wall demolition | $8,000 |
| Nov 20, 2020 | Completed final sign-off Aug 2022 | 1260 11th Av | remove & replace existing windows in existing opening at front of building. new bathroom w/shower on 3rd flr. renovate existing kitchen on 3rd flr. convert existing attic to habitable space. add sprinklers to meet nfpa13r & cbc section 903.1.Details
remove & replace existing windows in existing opening at front of building. new bathroom w/shower on 3rd flr. renovate existing kitchen on 3rd flr. convert existing attic to habitable space. add sprinklers to meet nfpa13r & cbc section 903.1. | $93,897 |
| Aug 14, 2020 | Completed final sign-off Apr 2021 | 426 Funston Av | remodel (e) kitchen in-kind (8x10). remodel (e) bathroom (5x5): retile shower, swap out toilet and vanity. replace (e) skylight at foyer; install one new subpanel. install a gas line for a fireplace in living room, replace 14 windows non-street visible inkind.Details
remodel (e) kitchen in-kind (8x10). remodel (e) bathroom (5x5): retile shower, swap out toilet and vanity. replace (e) skylight at foyer; install one new subpanel. install a gas line for a fireplace in living room, replace 14 windows non-street visible inkind. | $36,000 |
| Feb 14, 2020 | Completed final sign-off Apr 2021 | 2650 Franklin St | #12: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required.Details
#12: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required. | $28,000 |
| Feb 14, 2020 | Completed final sign-off Apr 2021 | 2650 Franklin St | #10: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required.Details
#10: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required. | $28,000 |
| Feb 14, 2020 | Completed final sign-off Jun 2020 | 358 Judson Av | remodel e kitchen in kind on 2nd fl. (remodel e bathroom under permit 202001212332). change e tub to shower. install an electrical subpanel for kitchen & bathroom. revision to 202001212332Details
remodel e kitchen in kind on 2nd fl. (remodel e bathroom under permit 202001212332). change e tub to shower. install an electrical subpanel for kitchen & bathroom. revision to 202001212332 | $20,000 |
| Feb 5, 2020 | Completed final sign-off Feb 2020 | 2650 Franklin St | unit 14: amend permit to include kitchen only. no bath. no bath. revision to pa # 2019-1104-6376Details
unit 14: amend permit to include kitchen only. no bath. no bath. revision to pa # 2019-1104-6376 | |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 2650 Franklin St | unit #19: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required.Details
unit #19: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required. | $5,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 2650 Franklin St | unit #14: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required.Details
unit #14: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required. | $5,000 |
| May 21, 2019 | Completed final sign-off Jul 2019 | 428 Funston Av | remodel existing kitchen at 2nd floor, remodel existing bathroom. no changes to existing floor plan.Details
remodel existing kitchen at 2nd floor, remodel existing bathroom. no changes to existing floor plan. | $15,000 |
| Jun 1, 2018 | Completed final sign-off Nov 2020 | 455 Vernon St | convert 1st flr area behind garage to habitable living space relocate interior stair add 3 new bedrm, 3 baths, laundry, family rm. 2nd flr - relocate kitchen living dining & 2 bedrooms add ensuite bath@ master bedrm, new ext stair to yard@ (e) deckDetails
convert 1st flr area behind garage to habitable living space relocate interior stair add 3 new bedrm, 3 baths, laundry, family rm. 2nd flr - relocate kitchen living dining & 2 bedrooms add ensuite bath@ master bedrm, new ext stair to yard@ (e) deck | $325,000 |
| Jan 25, 2018 | Completed final sign-off Apr 2018 | 700 Congo St | remodel one bathroom w/one shoer pan, no structural work no wall modificationDetails
remodel one bathroom w/one shoer pan, no structural work no wall modification | $5,000 |
| Nov 21, 2017 | Completed final sign-off Mar 2018 | 524 Brussels St | proposed to add 1 bedroom and entertainment area, remodel 1 bedroom and bathroom on ground level.Details
proposed to add 1 bedroom and entertainment area, remodel 1 bedroom and bathroom on ground level. | $45,000 |
| Nov 6, 2017 | Completed final sign-off Jun 2018 | 611 39th Av | revision to 201503060214. replace garage doors. relocate garage vents, eliminate approved bath window at 2nd fl, replace (e) entry door in front facade.Details
revision to 201503060214. replace garage doors. relocate garage vents, eliminate approved bath window at 2nd fl, replace (e) entry door in front facade. | $1,500 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 264 Seneca Av | remodel kitchen and bathroom in kind. no moving of walls, doors or windows.Details
remodel kitchen and bathroom in kind. no moving of walls, doors or windows. | $20,000 |
| Jul 25, 2017 | Completed final sign-off Mar 2019 | 1427 Ulloa St | nov correction permit addressing #201777731, revision to #201702149335: correctly show (e) condition of partially excavated crawl space (lower level)incl. media rm, full bath & bar sink. & rear bldg elevation. modify proposed 2nd flr. eliminate rear retaining wall & elevated.l/l media & bath.Details
nov correction permit addressing #201777731, revision to #201702149335: correctly show (e) condition of partially excavated crawl space (lower level)incl. media rm, full bath & bar sink. & rear bldg elevation. modify proposed 2nd flr. eliminate rear retaining wall & elevated.l/l media & bath. | $100,000 |
| Apr 10, 2017 | Completed final sign-off Aug 2017 | 111 Monticello St | replace interior stairs. new opening between living & dining. at 2nd flr remodel kitchen & bath, add new powder rm. at 1st flr remodel bath. add 2 skylightsDetails
replace interior stairs. new opening between living & dining. at 2nd flr remodel kitchen & bath, add new powder rm. at 1st flr remodel bath. add 2 skylights | $50,000 |
| Dec 28, 2016 | Completed final sign-off Jul 2017 | 1750 32nd Av | remodel (e)home-partial infill @ (e) tunnel entrance. reconstruction of primary stair, removal of non-conforming 2nd stair, minor excavation & leveling of ground flr. relocation of master suite, creation of family rm and foyer 2 1st flr. relocation of bath 1, creation of bath & home office @ 2nd fl.Details
remodel (e)home-partial infill @ (e) tunnel entrance. reconstruction of primary stair, removal of non-conforming 2nd stair, minor excavation & leveling of ground flr. relocation of master suite, creation of family rm and foyer 2 1st flr. relocation of bath 1, creation of bath & home office @ 2nd fl. | $80,000 |
| Aug 24, 2016 | Completed final sign-off Jul 2019 | 811 30th Av | 1)replace interior stairs between 1st and 2nd floor. 2)new bath at 1st fl. 3)kitchen & bathremodel at 2nd floor. 4)bath remodel at 3rd floor. 5)replace entry gate & decorative railing. 6)new sliding door at social room & new window at kitchen.Details
1)replace interior stairs between 1st and 2nd floor. 2)new bath at 1st fl. 3)kitchen & bathremodel at 2nd floor. 4)bath remodel at 3rd floor. 5)replace entry gate & decorative railing. 6)new sliding door at social room & new window at kitchen. | $70,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2020 | 1235 05th Av | interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade.Details
interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade. | $150,000 |
| Mar 24, 2016 | Completed final sign-off Apr 2017 | 426 Funston Av | remove illegal bathroom and convert into powder on 1st floor.Details
remove illegal bathroom and convert into powder on 1st floor. | $7,000 |
| Jan 29, 2016 | Completed final sign-off Feb 2020 | 962 Edinburgh St | 3 story horizontal addition at rear yard. 3 new bedrooms. 2 new baths. kitchen remodel , new conditioned space at 1st floor.Details
3 story horizontal addition at rear yard. 3 new bedrooms. 2 new baths. kitchen remodel , new conditioned space at 1st floor. | $180,000 |
| Jan 19, 2016 | Completed final sign-off Jan 2018 | 1401 05th Av | new concrete foundation and slab, new walls for new family room & new bathroom, add new window, replace two existing windows, replace garage doors.Details
new concrete foundation and slab, new walls for new family room & new bathroom, add new window, replace two existing windows, replace garage doors. | $135,000 |
| Aug 17, 2015 | Completed final sign-off Jul 2016 | 1674 26th Av | horizontial addition, lightwell partial in fill along south property line at 1/f & 2/f. 1/f: convert storage space to habitable, 2 bedrooms, bath, family room. replace interior stairs, new deck with stairs at rear yard, relocate & remodel kitchen, remodel bath & new bath at 2/fDetails
horizontial addition, lightwell partial in fill along south property line at 1/f & 2/f. 1/f: convert storage space to habitable, 2 bedrooms, bath, family room. replace interior stairs, new deck with stairs at rear yard, relocate & remodel kitchen, remodel bath & new bath at 2/f | $85,000 |
| Mar 24, 2015 | Never finaled issued Apr 2015, no final | 1774 35th Av | 1st flr: rooms down added (n) bedroom, bath. remodel kitchen & bath and infill lightwell @ 2nd flr.Details
1st flr: rooms down added (n) bedroom, bath. remodel kitchen & bath and infill lightwell @ 2nd flr. | $110,000 |
| Dec 17, 2013 | Completed final sign-off Mar 2014 | 700 Congo St | gr fl improvement to include family room and bedroom, full bath. fire proof garage on 1st fl. wall and ceiling to comply with code. 2nd fl: upgrade deck rail to comply with code. repair kitchen counter. legalize 1st floor bathroom.Details
gr fl improvement to include family room and bedroom, full bath. fire proof garage on 1st fl. wall and ceiling to comply with code. 2nd fl: upgrade deck rail to comply with code. repair kitchen counter. legalize 1st floor bathroom. | $30,000 |
| Aug 7, 2013 | Completed final sign-off Mar 2014 | 679 39th Av | 1st fl: improve garage arear with 2 bederoom, 1 bath, 1 study room and 1 family room with 1 remaining parking. 2nd fl: remodel kitchen and bath. adjust room sizes to include 1 extra bath and bedroom and add 79 sq ft towards left sid of building as infill. new deck at rearDetails
1st fl: improve garage arear with 2 bederoom, 1 bath, 1 study room and 1 family room with 1 remaining parking. 2nd fl: remodel kitchen and bath. adjust room sizes to include 1 extra bath and bedroom and add 79 sq ft towards left sid of building as infill. new deck at rear | $125,000 |
| Jul 9, 2013 | Completed final sign-off Nov 2016 | 3984 20th St | vertical addition: new 2nd story with roof deck, 2 new bedrooms, 2 new baths, 1 kitchen remodel. replace foundations & seismic upgrade. convert storage area @ garage into habitable space. interior remodel of (e) dwelling.Details
vertical addition: new 2nd story with roof deck, 2 new bedrooms, 2 new baths, 1 kitchen remodel. replace foundations & seismic upgrade. convert storage area @ garage into habitable space. interior remodel of (e) dwelling. | $290,000 |
| Jul 2, 2013 | Completed final sign-off Aug 2013 | 314 24th Av | 1st floor enlose space under sunroom with new walls for storage, 2nd floor remodel power room in rear of bldg to full bath with shower.Details
1st floor enlose space under sunroom with new walls for storage, 2nd floor remodel power room in rear of bldg to full bath with shower. | $13,500 |
| Mar 11, 2013 | Completed final sign-off Jun 2013 | 314 24th Av | remodel kitchen on 2nd floor. remodel bathroom on 3rd floor. no structural work.Details
remodel kitchen on 2nd floor. remodel bathroom on 3rd floor. no structural work. | $15,000 |
| Nov 30, 2012 | Completed final sign-off Apr 2013 | 816 Ortega St | revision to pa#2012-0731-6155. 1st floor add (n) 1 bedroom, 1 bathroom & 1 family room w/ garage space for single car parking. all interior work.Details
revision to pa#2012-0731-6155. 1st floor add (n) 1 bedroom, 1 bathroom & 1 family room w/ garage space for single car parking. all interior work. | $23,000 |
| Nov 30, 2012 | Completed final sign-off May 2017 | 95 Middlefield Dr | 1st floor: add wall in garage for storage. 2 car garage to stay. 2nd floor / main floor: add bay window to bedroom, remove (e) closet for location of stair s to upper floor/3rd floor. 3rd floor/upper floor: add 2 bedrooms, 1 study room & 1 bath over (e) 2nd floor/main floor.Details
1st floor: add wall in garage for storage. 2 car garage to stay. 2nd floor / main floor: add bay window to bedroom, remove (e) closet for location of stair s to upper floor/3rd floor. 3rd floor/upper floor: add 2 bedrooms, 1 study room & 1 bath over (e) 2nd floor/main floor. | $105,000 |
| Jul 3, 2012 | Completed final sign-off Oct 2012 | 666 29th Av | remodeling of first floor unimproved space to have family rm, bedrm, bath, study area, 1 car parking space with laundry facility. new gas furnace and flue vent pipe.Details
remodeling of first floor unimproved space to have family rm, bedrm, bath, study area, 1 car parking space with laundry facility. new gas furnace and flue vent pipe. | $43,500 |
| Dec 15, 2011 | Completed final sign-off May 2012 | 2479 40th Av | at garage level (1st floor) : construct non-bearing walls, for new family, study, bath & laundry. remove (e) post, replace (e) furnace & duct work w/new furnace, & replace (e) front irongate w/solid wood door w/ sidelites.Details
at garage level (1st floor) : construct non-bearing walls, for new family, study, bath & laundry. remove (e) post, replace (e) furnace & duct work w/new furnace, & replace (e) front irongate w/solid wood door w/ sidelites. | $35,000 |
| Jun 28, 2011 | Completed final sign-off Mar 2012 | 1465 09th Av | 1st floor:enclose space under extg sun room to become part of family room. this floor improvement to have family room, study room area,bathroom and bedroom. laundry facility extension of space under sunroom is under the foot print of upper floors.Details
1st floor:enclose space under extg sun room to become part of family room. this floor improvement to have family room, study room area,bathroom and bedroom. laundry facility extension of space under sunroom is under the foot print of upper floors. | $83,000 |
| Nov 30, 2010 | Completed final sign-off Oct 2011 | 621 Santiago St | remodeling of (e) first floor consisting of family room, bedroom and bathroom. second floor minor work in hallwayDetails
remodeling of (e) first floor consisting of family room, bedroom and bathroom. second floor minor work in hallway | $50,000 |
| Nov 12, 2008 | Completed final sign-off Mar 2009 | 295 Staples Av | remodel 1 kitchen & 1 bathroom. remove / replace roof. change electrical panel, install electrical outlets & lights through out house. remove & replace fron stair. less than 50% repair. replace heating unit. (f.a.u) interior / exterior painting.Details
remodel 1 kitchen & 1 bathroom. remove / replace roof. change electrical panel, install electrical outlets & lights through out house. remove & replace fron stair. less than 50% repair. replace heating unit. (f.a.u) interior / exterior painting. | $40,000 |
| Jun 30, 2008 | Completed final sign-off Nov 2008 | 2079 41st Av | add new bedroom, family room, bathroom, & study room with tub on the ground floor. remodel (e) upper floor kitchen & bathroom. add new full bath to the rear bedroom. all fluorecent light in the kitchen area. fire repair & re-sheet rock & install insulation. (n) skylight.Details
add new bedroom, family room, bathroom, & study room with tub on the ground floor. remodel (e) upper floor kitchen & bathroom. add new full bath to the rear bedroom. all fluorecent light in the kitchen area. fire repair & re-sheet rock & install insulation. (n) skylight. | $35,000 |
| Mar 7, 2008 | Never finaled issued May 2008, no final | 630 La Grande Av | new bathroom 2/fl. (n) bathroom window. remodel kitchen on 2nd floor. enlarge closet on 3rd floor. install electrical under separate permit.Details
new bathroom 2/fl. (n) bathroom window. remodel kitchen on 2nd floor. enlarge closet on 3rd floor. install electrical under separate permit. | $20,000 |
| Nov 9, 2005 | Completed final sign-off Sep 2006 | 243 Bradford St | remove/replace front steps,repair rear of bldg.(bathroom),repair dry rot inr ear bldg. repair rear stair, less 50%. replace existing garage door.Details
remove/replace front steps,repair rear of bldg.(bathroom),repair dry rot inr ear bldg. repair rear stair, less 50%. replace existing garage door. | $74,000 |