Block 1532, lot 029
426 Funston Ave
- City’s use
- Multi-Family Residential
- Built
- 1920
- Stories
- 2
- Units
- 2
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 3,320 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2020 | Completed final sign-off Apr 2021 | 426 Funston Av | Traube Construction Company | remodel (e) kitchen in-kind (8x10). remodel (e) bathroom (5x5): retile shower, swap out toilet and vanity. replace (e) skylight at foyer; install one new subpanel. install a gas line for a fireplace in living room, replace 14 windows non-street visible inkind.Details
remodel (e) kitchen in-kind (8x10). remodel (e) bathroom (5x5): retile shower, swap out toilet and vanity. replace (e) skylight at foyer; install one new subpanel. install a gas line for a fireplace in living room, replace 14 windows non-street visible inkind. | $36,000 |
| May 21, 2019 | Completed final sign-off Jul 2019 | 428 Funston Av | Traube Construction Company | remodel existing kitchen at 2nd floor, remodel existing bathroom. no changes to existing floor plan.Details
remodel existing kitchen at 2nd floor, remodel existing bathroom. no changes to existing floor plan. | $15,000 |
| Jan 24, 2019 | Completed final sign-off May 2019 | 428 Funston Av | Traube Construction Company | demo e kitchen on 2nd flDetails
demo e kitchen on 2nd fl | $1,800 |
| Jan 18, 2019 | Completed final sign-off Jul 2019 | 428 Funston Av | replace bedrooms & kitchen windows; not street facing, replace 1/2 bathroom & 1/4 bathroom windows, total 13 windows same size, same location, max u.factor 0.32Details
replace bedrooms & kitchen windows; not street facing, replace 1/2 bathroom & 1/4 bathroom windows, total 13 windows same size, same location, max u.factor 0.32 | $5,000 | |
| Mar 24, 2016 | Completed final sign-off Apr 2017 | 426 Funston Av | Traube Construction Company | remove illegal bathroom and convert into powder on 1st floor.Details
remove illegal bathroom and convert into powder on 1st floor. | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Traube Construction Company (4)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.