Back to kitchen remodel contractors
Traube Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Jun 2026
- Last 24 months
- 2 permits filed
94 permits since 2000: 81 completed, 3 in progress, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
31 kitchen remodel permits: 27 completed, 1 in progress, 3 never finaled. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2026 | In progress issued Jun 2026 | 823 Divisadero St | unit 1 remodel kitchen like for like, unit 2 remodel kitchen and bathroom like for like. no conversions. in kind.Details
unit 1 remodel kitchen like for like, unit 2 remodel kitchen and bathroom like for like. no conversions. in kind. | $28,000 |
| Oct 3, 2022 | Completed final sign-off Dec 2022 | 179 Rome St | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $26,500 |
| Nov 20, 2020 | Completed final sign-off Aug 2022 | 1260 11th Av | remove & replace existing windows in existing opening at front of building. new bathroom w/shower on 3rd flr. renovate existing kitchen on 3rd flr. convert existing attic to habitable space. add sprinklers to meet nfpa13r & cbc section 903.1.Details
remove & replace existing windows in existing opening at front of building. new bathroom w/shower on 3rd flr. renovate existing kitchen on 3rd flr. convert existing attic to habitable space. add sprinklers to meet nfpa13r & cbc section 903.1. | $93,897 |
| Aug 14, 2020 | Completed final sign-off Apr 2021 | 426 Funston Av | remodel (e) kitchen in-kind (8x10). remodel (e) bathroom (5x5): retile shower, swap out toilet and vanity. replace (e) skylight at foyer; install one new subpanel. install a gas line for a fireplace in living room, replace 14 windows non-street visible inkind.Details
remodel (e) kitchen in-kind (8x10). remodel (e) bathroom (5x5): retile shower, swap out toilet and vanity. replace (e) skylight at foyer; install one new subpanel. install a gas line for a fireplace in living room, replace 14 windows non-street visible inkind. | $36,000 |
| Feb 14, 2020 | Completed final sign-off Apr 2021 | 2650 Franklin St | #12: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required.Details
#12: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required. | $28,000 |
| Feb 14, 2020 | Completed final sign-off Apr 2021 | 2650 Franklin St | #10: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required.Details
#10: kitchen & bathroom remodel in kind. cabinets, floor, tub surround, sinks, add gfi, panel, fixtures, no work in common area. all work within units. no fire alarm or sprinkler work required. | $28,000 |
| Feb 14, 2020 | Completed final sign-off Jun 2020 | 358 Judson Av | remodel e kitchen in kind on 2nd fl. (remodel e bathroom under permit 202001212332). change e tub to shower. install an electrical subpanel for kitchen & bathroom. revision to 202001212332Details
remodel e kitchen in kind on 2nd fl. (remodel e bathroom under permit 202001212332). change e tub to shower. install an electrical subpanel for kitchen & bathroom. revision to 202001212332 | $20,000 |
| Feb 5, 2020 | Completed final sign-off Feb 2020 | 2650 Franklin St | unit 14: amend permit to include kitchen only. no bath. no bath. revision to pa # 2019-1104-6376Details
unit 14: amend permit to include kitchen only. no bath. no bath. revision to pa # 2019-1104-6376 | |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 2650 Franklin St | unit #19: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required.Details
unit #19: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required. | $5,000 |
| Nov 4, 2019 | Completed final sign-off Feb 2020 | 2650 Franklin St | unit #14: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required.Details
unit #14: kitchen and bathroom remodel in kind. cabinets, floors, tub surround, sinks, add gfi, panel, fixtures. no work in common area. all work within units. no fire alarm or sprinkler work required. | $5,000 |
| May 21, 2019 | Completed final sign-off Jul 2019 | 428 Funston Av | remodel existing kitchen at 2nd floor, remodel existing bathroom. no changes to existing floor plan.Details
remodel existing kitchen at 2nd floor, remodel existing bathroom. no changes to existing floor plan. | $15,000 |
| Jan 24, 2019 | Completed final sign-off May 2019 | 428 Funston Av | demo e kitchen on 2nd flDetails
demo e kitchen on 2nd fl | $1,800 |
| Jun 1, 2018 | Completed final sign-off Nov 2020 | 455 Vernon St | convert 1st flr area behind garage to habitable living space relocate interior stair add 3 new bedrm, 3 baths, laundry, family rm. 2nd flr - relocate kitchen living dining & 2 bedrooms add ensuite bath@ master bedrm, new ext stair to yard@ (e) deckDetails
convert 1st flr area behind garage to habitable living space relocate interior stair add 3 new bedrm, 3 baths, laundry, family rm. 2nd flr - relocate kitchen living dining & 2 bedrooms add ensuite bath@ master bedrm, new ext stair to yard@ (e) deck | $325,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 264 Seneca Av | remodel kitchen and bathroom in kind. no moving of walls, doors or windows.Details
remodel kitchen and bathroom in kind. no moving of walls, doors or windows. | $20,000 |
| Apr 10, 2017 | Completed final sign-off Aug 2017 | 111 Monticello St | replace interior stairs. new opening between living & dining. at 2nd flr remodel kitchen & bath, add new powder rm. at 1st flr remodel bath. add 2 skylightsDetails
replace interior stairs. new opening between living & dining. at 2nd flr remodel kitchen & bath, add new powder rm. at 1st flr remodel bath. add 2 skylights | $50,000 |
| Oct 3, 2016 | Completed final sign-off Oct 2017 | 242 San Jose Av | interior removation to include 2 new bathrms and kitchen finishes, new wood folding door system to be installed on w. rear facade. new windows on the 3rd flr at w rear facade to be replaced in kind. new windo to be replaced on north side facade to match (e) window from office.Details
interior removation to include 2 new bathrms and kitchen finishes, new wood folding door system to be installed on w. rear facade. new windows on the 3rd flr at w rear facade to be replaced in kind. new windo to be replaced on north side facade to match (e) window from office. | $200,000 |
| Aug 24, 2016 | Completed final sign-off Jul 2019 | 811 30th Av | 1)replace interior stairs between 1st and 2nd floor. 2)new bath at 1st fl. 3)kitchen & bathremodel at 2nd floor. 4)bath remodel at 3rd floor. 5)replace entry gate & decorative railing. 6)new sliding door at social room & new window at kitchen.Details
1)replace interior stairs between 1st and 2nd floor. 2)new bath at 1st fl. 3)kitchen & bathremodel at 2nd floor. 4)bath remodel at 3rd floor. 5)replace entry gate & decorative railing. 6)new sliding door at social room & new window at kitchen. | $70,000 |
| Apr 28, 2016 | Completed final sign-off Jun 2020 | 1235 05th Av | interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade.Details
interior: new living space to (e) area behind garage: new family room, bed room, bath, stairs, removel (e) kitchen, powder room. exterior: rear addition infill @ nw corner on ground + second floors, replace (e) ext rear deck + stairs, new windows on rear facade. | $150,000 |
| Jan 29, 2016 | Completed final sign-off Feb 2020 | 962 Edinburgh St | 3 story horizontal addition at rear yard. 3 new bedrooms. 2 new baths. kitchen remodel , new conditioned space at 1st floor.Details
3 story horizontal addition at rear yard. 3 new bedrooms. 2 new baths. kitchen remodel , new conditioned space at 1st floor. | $180,000 |
| Aug 17, 2015 | Completed final sign-off Jul 2016 | 1674 26th Av | horizontial addition, lightwell partial in fill along south property line at 1/f & 2/f. 1/f: convert storage space to habitable, 2 bedrooms, bath, family room. replace interior stairs, new deck with stairs at rear yard, relocate & remodel kitchen, remodel bath & new bath at 2/fDetails
horizontial addition, lightwell partial in fill along south property line at 1/f & 2/f. 1/f: convert storage space to habitable, 2 bedrooms, bath, family room. replace interior stairs, new deck with stairs at rear yard, relocate & remodel kitchen, remodel bath & new bath at 2/f | $85,000 |
| Mar 24, 2015 | Never finaled issued Apr 2015, no final | 1774 35th Av | 1st flr: rooms down added (n) bedroom, bath. remodel kitchen & bath and infill lightwell @ 2nd flr.Details
1st flr: rooms down added (n) bedroom, bath. remodel kitchen & bath and infill lightwell @ 2nd flr. | $110,000 |
| Dec 17, 2013 | Completed final sign-off Mar 2014 | 700 Congo St | gr fl improvement to include family room and bedroom, full bath. fire proof garage on 1st fl. wall and ceiling to comply with code. 2nd fl: upgrade deck rail to comply with code. repair kitchen counter. legalize 1st floor bathroom.Details
gr fl improvement to include family room and bedroom, full bath. fire proof garage on 1st fl. wall and ceiling to comply with code. 2nd fl: upgrade deck rail to comply with code. repair kitchen counter. legalize 1st floor bathroom. | $30,000 |
| Aug 7, 2013 | Completed final sign-off Mar 2014 | 679 39th Av | 1st fl: improve garage arear with 2 bederoom, 1 bath, 1 study room and 1 family room with 1 remaining parking. 2nd fl: remodel kitchen and bath. adjust room sizes to include 1 extra bath and bedroom and add 79 sq ft towards left sid of building as infill. new deck at rearDetails
1st fl: improve garage arear with 2 bederoom, 1 bath, 1 study room and 1 family room with 1 remaining parking. 2nd fl: remodel kitchen and bath. adjust room sizes to include 1 extra bath and bedroom and add 79 sq ft towards left sid of building as infill. new deck at rear | $125,000 |
| Jul 9, 2013 | Completed final sign-off Nov 2016 | 3984 20th St | vertical addition: new 2nd story with roof deck, 2 new bedrooms, 2 new baths, 1 kitchen remodel. replace foundations & seismic upgrade. convert storage area @ garage into habitable space. interior remodel of (e) dwelling.Details
vertical addition: new 2nd story with roof deck, 2 new bedrooms, 2 new baths, 1 kitchen remodel. replace foundations & seismic upgrade. convert storage area @ garage into habitable space. interior remodel of (e) dwelling. | $290,000 |
| Mar 11, 2013 | Completed final sign-off Jun 2013 | 314 24th Av | remodel kitchen on 2nd floor. remodel bathroom on 3rd floor. no structural work.Details
remodel kitchen on 2nd floor. remodel bathroom on 3rd floor. no structural work. | $15,000 |
| Dec 28, 2012 | Completed final sign-off Mar 2013 | 675 Noriega St | remodel (e) kitchen, replacing (e) cabinets & counter tops. replace one (e) 2x6 support post with 6x6 post.Details
remodel (e) kitchen, replacing (e) cabinets & counter tops. replace one (e) 2x6 support post with 6x6 post. | $5,000 |
| Jan 2, 2009 | Completed final sign-off Mar 2009 | 476 29th St | comply with his nov# 200789712. remodel 3rd floor kitchen, install 1 each new plug for each room for 2 each unit. install 2 gas furnace, relocate 2 each water heater, install washer & dryer, repipe all galvinlize pipe with copper, install gfic @ 2nd floor kitchen. relocate kitchen sink.Details
comply with his nov# 200789712. remodel 3rd floor kitchen, install 1 each new plug for each room for 2 each unit. install 2 gas furnace, relocate 2 each water heater, install washer & dryer, repipe all galvinlize pipe with copper, install gfic @ 2nd floor kitchen. relocate kitchen sink. | $48,000 |
| Nov 12, 2008 | Completed final sign-off Mar 2009 | 295 Staples Av | remodel 1 kitchen & 1 bathroom. remove / replace roof. change electrical panel, install electrical outlets & lights through out house. remove & replace fron stair. less than 50% repair. replace heating unit. (f.a.u) interior / exterior painting.Details
remodel 1 kitchen & 1 bathroom. remove / replace roof. change electrical panel, install electrical outlets & lights through out house. remove & replace fron stair. less than 50% repair. replace heating unit. (f.a.u) interior / exterior painting. | $40,000 |
| Jun 30, 2008 | Completed final sign-off Nov 2008 | 2079 41st Av | add new bedroom, family room, bathroom, & study room with tub on the ground floor. remodel (e) upper floor kitchen & bathroom. add new full bath to the rear bedroom. all fluorecent light in the kitchen area. fire repair & re-sheet rock & install insulation. (n) skylight.Details
add new bedroom, family room, bathroom, & study room with tub on the ground floor. remodel (e) upper floor kitchen & bathroom. add new full bath to the rear bedroom. all fluorecent light in the kitchen area. fire repair & re-sheet rock & install insulation. (n) skylight. | $35,000 |
| Mar 10, 2008 | Completed final sign-off Mar 2008 | 646 41st Av | remove & repair less than 50% of deck structure, replace 1x decking material w/ 2x6 pressure treated material. remove and replace with one-15 ft. long joist. remove & replace one middle post at center of stair. reinforce deck joist next to kitchen door with additional joist to stiffen the structure.Details
remove & repair less than 50% of deck structure, replace 1x decking material w/ 2x6 pressure treated material. remove and replace with one-15 ft. long joist. remove & replace one middle post at center of stair. reinforce deck joist next to kitchen door with additional joist to stiffen the structure. | $3,200 |
| Mar 7, 2008 | Never finaled issued May 2008, no final | 630 La Grande Av | new bathroom 2/fl. (n) bathroom window. remodel kitchen on 2nd floor. enlarge closet on 3rd floor. install electrical under separate permit.Details
new bathroom 2/fl. (n) bathroom window. remodel kitchen on 2nd floor. enlarge closet on 3rd floor. install electrical under separate permit. | $20,000 |