Back to kitchen remodel contractors
Transform Home Improvmeent
- Based in
- Longwood
- On San Francisco permits
- Aug 2019 to Jul 2024
- Last 24 months
- 0 permits filed
57 permits since 2000: 33 completed, 1 in progress, 15 never finaled, 8 expired or cancelled.
Of the 15 never-finaled permits, 11 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 18 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2021 | Completed final sign-off Feb 2022 | 130 Baker St | 1 kitchen remodel, replace countertop, faucet, dispenser, sink under mount, garbage disposal, (2) (e) electrical outletsDetails
1 kitchen remodel, replace countertop, faucet, dispenser, sink under mount, garbage disposal, (2) (e) electrical outlets | $13,630 |
| Aug 9, 2021 | Never finaled issued Sep 2021, no final | 15 Margaret Av | kitchen remodel: no changes to walls, remove (e) bottom cabinets, c/o stove. replace (e) plumbing, extend (e) stovegas line 10ft tie in 2 outlets to (e) electrical. replace 4 gfci outlets tie in dedicated fridege line to (e) electrical. replace 100 amp subpanel with 125 amp.Details
kitchen remodel: no changes to walls, remove (e) bottom cabinets, c/o stove. replace (e) plumbing, extend (e) stovegas line 10ft tie in 2 outlets to (e) electrical. replace 4 gfci outlets tie in dedicated fridege line to (e) electrical. replace 100 amp subpanel with 125 amp. | $40,347 |