Back to kitchen remodel contractors
Trans -City Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jan 2010
- Last 24 months
- 0 permits filed
17 permits since 2000: 12 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2007 | Completed final sign-off Apr 2008 | 1319 San Bruno Av | remove bearing wall & replace with post & beams, install new window, upgrade garage wall & door to 1-hr. resistive rating. infill kitchen window.Details
remove bearing wall & replace with post & beams, install new window, upgrade garage wall & door to 1-hr. resistive rating. infill kitchen window. | $12,000 |
| Sep 19, 2007 | Completed final sign-off Mar 2008 | 1500 34th Av | remodel kitchen and baths, add one bath. upgrade electrical. existing bathroom on g/f was original.Details
remodel kitchen and baths, add one bath. upgrade electrical. existing bathroom on g/f was original. | $20,000 |
| Jul 3, 2007 | Completed final sign-off Oct 2007 | 565 Cordova St | remodel kitchen and breakfast room. new kitchen cabinets with granite tops and tile floor. 50% new lighting to be fluorescent.Details
remodel kitchen and breakfast room. new kitchen cabinets with granite tops and tile floor. 50% new lighting to be fluorescent. | $5,000 |
| Jan 20, 2006 | Completed final sign-off May 2006 | 1470 33rd Av | replace 10 windows back of the house. and remodel 1 kitchen, 1 bathroom, change carbinet. no windows @ front.Details
replace 10 windows back of the house. and remodel 1 kitchen, 1 bathroom, change carbinet. no windows @ front. | $20,000 |
| Nov 27, 2002 | Completed final sign-off Jan 2003 | 2429 22nd Av | replace 2 windows in kitchen,same size & location. remodel kitchen cabinet,replace stove,counter topDetails
replace 2 windows in kitchen,same size & location. remodel kitchen cabinet,replace stove,counter top | $12,000 |
| Sep 27, 2001 | Completed final sign-off Apr 2002 | 553 28th Av | remodeling kitchen & bathroom. no structural work. repair 8 windows. rear not visible from street.Details
remodeling kitchen & bathroom. no structural work. repair 8 windows. rear not visible from street. | $19,500 |