Back to kitchen remodel contractors
Tracy Anthony General Contractor
- Based in
- Lafayette
- On San Francisco permits
- Mar 2008 to May 2026
- Last 24 months
- 4 permits filed
88 permits since 2000: 72 completed, 8 never finaled, 8 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
26 kitchen remodel permits: 25 completed, 1 never finaled. Typically 5 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2025 | Completed final sign-off Mar 2026 | 1835 Franklin St | remove kitchen and remove and replace finishes in 2 bathroom. install laundry closet and remove 2 non bearing wallsDetails
remove kitchen and remove and replace finishes in 2 bathroom. install laundry closet and remove 2 non bearing walls | $117,000 |
| Mar 26, 2025 | Completed final sign-off Sep 2025 | 1835 Franklin St | 14/f unit 1402: remodel (e) condo. remove non bearing wall in kitchen. remodel kitchen in kind. electrical and plumbing remodel. remove/replace (2) baths finishes in kind.Details
14/f unit 1402: remodel (e) condo. remove non bearing wall in kitchen. remodel kitchen in kind. electrical and plumbing remodel. remove/replace (2) baths finishes in kind. | $145,000 |
| Nov 2, 2023 | Completed final sign-off May 2026 | 66 Lakewood Av | revision to pa# 202306018991, move wall in lower level , move footing & add beam, add w/d in lower lvl, add window in laundry, add sink in tea station in kitchen.Details
revision to pa# 202306018991, move wall in lower level , move footing & add beam, add w/d in lower lvl, add window in laundry, add sink in tea station in kitchen. | |
| Jan 15, 2021 | Never finaled issued Jul 2022, no final | 353 Park St | add master suite under (e) deck to rear of sfr. 35 sf addition to kitchen by pushing exterior wall out onto deck. remodel kitchen and garage. repair entry steps due to dryrot. remodel bathroom on 3rd floor.Details
add master suite under (e) deck to rear of sfr. 35 sf addition to kitchen by pushing exterior wall out onto deck. remodel kitchen and garage. repair entry steps due to dryrot. remodel bathroom on 3rd floor. | $289,650 |
| Mar 5, 2019 | Completed final sign-off May 2019 | 1451 Fulton St | remove and replace kitchen finishes in kind. no exterior work.Details
remove and replace kitchen finishes in kind. no exterior work. | $37,900 |
| Oct 22, 2018 | Completed final sign-off Aug 2022 | 565 Eureka St | rear addition @ 1st & 2nd flrs. add shed roof dormer @ roof @ rear. 1st flr to be partially excavated & developed for family rm, bdrm & bathrm. add 1/2 bath, laundry closet & sitting rm to 2nd flr & remodel kitchen. add bathrm to 3rd flr. no work visible from street.Details
rear addition @ 1st & 2nd flrs. add shed roof dormer @ roof @ rear. 1st flr to be partially excavated & developed for family rm, bdrm & bathrm. add 1/2 bath, laundry closet & sitting rm to 2nd flr & remodel kitchen. add bathrm to 3rd flr. no work visible from street. | $235,000 |
| Jan 11, 2016 | Completed final sign-off Oct 2018 | 230 Caselli Av | interior remodel of e single family residence. increase habitable space at 1st fl addition of new bath at 1st fl. replace e stair with new stair, remodel kitchen on 2nd fl, new retaining walls and landscaping in rear yard, addition of new wood deck at grade and new deck max 10" above grade rear yardDetails
interior remodel of e single family residence. increase habitable space at 1st fl addition of new bath at 1st fl. replace e stair with new stair, remodel kitchen on 2nd fl, new retaining walls and landscaping in rear yard, addition of new wood deck at grade and new deck max 10" above grade rear yard | $229,718 |
| Aug 28, 2015 | Completed final sign-off Oct 2016 | 1963 Grove St | 105 s1 ft horizontal addition at ground floor only to match envelop of above floors. infill lightwell; remodel storage room to art studio at ground floor; remodel kitchen and bath at 1st and 2nd floor; add half bath at ground floor.Details
105 s1 ft horizontal addition at ground floor only to match envelop of above floors. infill lightwell; remodel storage room to art studio at ground floor; remodel kitchen and bath at 1st and 2nd floor; add half bath at ground floor. | $40,000 |
| Jul 20, 2015 | Completed final sign-off Nov 2015 | 530 Chestnut St | remodel kitchen in-kind, new plumbing, electrical, cabinets. no change in wall & opening layout. min 50% wattage high efficacy lighting.Details
remodel kitchen in-kind, new plumbing, electrical, cabinets. no change in wall & opening layout. min 50% wattage high efficacy lighting. | $39,000 |
| Feb 5, 2015 | Completed final sign-off Oct 2015 | 2107 Bush St | revision to app#201412294556. remove non-bearing wall in kitchen.Details
revision to app#201412294556. remove non-bearing wall in kitchen. | |
| Dec 29, 2014 | Completed final sign-off Oct 2015 | 2107 Bush St | remodel kitchen and bath. remove wall between dinning room and kitchen. install beam and post pads. install window and french doors in rear.Details
remodel kitchen and bath. remove wall between dinning room and kitchen. install beam and post pads. install window and french doors in rear. | $107,000 |
| Sep 18, 2014 | Completed final sign-off Oct 2014 | 330 Arguello Bl | unit #2: remodel kitchen in-kind, lighting & constrol per cec 150(k).Details
unit #2: remodel kitchen in-kind, lighting & constrol per cec 150(k). | $9,240 |
| Sep 18, 2014 | Completed final sign-off Jul 2015 | 3906 26th St | remodel kitchen in-kind, lighting constrol per cec 150(k).Details
remodel kitchen in-kind, lighting constrol per cec 150(k). | $9,100 |
| Nov 20, 2013 | Completed final sign-off Jun 2014 | 2618 Sutter St | remodel kitchen, 2 remodel & 1 (n) bathroom, kitchenette. add shear wall in (n) kitchen wall to bsmt.Details
remodel kitchen, 2 remodel & 1 (n) bathroom, kitchenette. add shear wall in (n) kitchen wall to bsmt. | $160,000 |
| Oct 30, 2013 | Completed final sign-off Nov 2013 | 330 Arguello Bl | unit #3: remove/replace kitchen cabinets, countertops, add microwave outlet, remove/replace bath floor tile and tub surround, reuse (e) fixtures.Details
unit #3: remove/replace kitchen cabinets, countertops, add microwave outlet, remove/replace bath floor tile and tub surround, reuse (e) fixtures. | $9,600 |
| May 7, 2013 | Completed final sign-off Jun 2013 | 108 Encline Ct | remove/replace 12' kitchen cabinet, new sink, dw & countertops, update plumbing for sink, faucet, d.w., update electrical. all interior work.Details
remove/replace 12' kitchen cabinet, new sink, dw & countertops, update plumbing for sink, faucet, d.w., update electrical. all interior work. | $18,500 |
| Mar 27, 2013 | Completed final sign-off Dec 2013 | 545 Valley St | remodel 4 bedrooms, 3 baths, 1 kitchen. add half bath. remove and replace windows. seismic upgrades. replace hvac, electrical and plumbing. remodel facade.add one skylight & repair deck at rear.Details
remodel 4 bedrooms, 3 baths, 1 kitchen. add half bath. remove and replace windows. seismic upgrades. replace hvac, electrical and plumbing. remodel facade.add one skylight & repair deck at rear. | $135,000 |
| Jan 7, 2013 | Completed final sign-off Feb 2013 | 10 Miller Pl | unit #1202-remove & replace kitchen cabinets face, new sink & faucet. new counter top.Details
unit #1202-remove & replace kitchen cabinets face, new sink & faucet. new counter top. | $2,500 |
| Aug 8, 2012 | Completed final sign-off Aug 2013 | 2973 Pine St | interior remodel, kitchen and 2.5 bathrooms. upper level horzontal addition, master bedroom, 1 bathroom.Details
interior remodel, kitchen and 2.5 bathrooms. upper level horzontal addition, master bedroom, 1 bathroom. | $276,500 |
| Jul 3, 2012 | Completed final sign-off Dec 2012 | 808 South Van Ness Av | remodel (e) residence including foundation, new kitchen, 2.5 bath. new plumbing, electrical, hvac to comply with nov# 200721651, 201212041, 201212822 dated 4/23/08, 4/4/12, 5/8/12.Details
remodel (e) residence including foundation, new kitchen, 2.5 bath. new plumbing, electrical, hvac to comply with nov# 200721651, 201212041, 201212822 dated 4/23/08, 4/4/12, 5/8/12. | $127,500 |
| May 3, 2012 | Completed final sign-off Nov 2012 | 155 Hazelwood Av | interior remodel kitchen, master suite-enlarge (e) bathroom & create closet & add 1 new powder room. new downstairs bedroom, bathroom, family roomDetails
interior remodel kitchen, master suite-enlarge (e) bathroom & create closet & add 1 new powder room. new downstairs bedroom, bathroom, family room | $95,000 |
| Mar 29, 2012 | Completed final sign-off Jul 2013 | 983 Wisconsin St | interior remodel. (e) 3 bedroom, 1 bath. new 3 bed, 2.5 bath, new kitchen.Details
interior remodel. (e) 3 bedroom, 1 bath. new 3 bed, 2.5 bath, new kitchen. | $150,000 |
| Dec 15, 2011 | Completed final sign-off Apr 2012 | 783 23rd Av | remodel ground floor to include new bath, bedroom, laundry room. remodel kitchen and famly rm at 1st fl. add master bath at 2nd fl. remodel e bath at 2nd fl. replace windows front and rear. replace garage door. structural strengthening per plans.Details
remodel ground floor to include new bath, bedroom, laundry room. remodel kitchen and famly rm at 1st fl. add master bath at 2nd fl. remodel e bath at 2nd fl. replace windows front and rear. replace garage door. structural strengthening per plans. | $50,000 |
| May 24, 2011 | Completed final sign-off Jul 2011 | 219 Gennessee St | remodel kitchen, remodel bathroom. relocate laundry, remove and replace siding like to like and windows at front. siding material will be wood siding & window material will be wood material, in kind.Details
remodel kitchen, remodel bathroom. relocate laundry, remove and replace siding like to like and windows at front. siding material will be wood siding & window material will be wood material, in kind. | $50,000 |
| Oct 9, 2009 | Completed final sign-off Dec 2009 | 2503 Anza St | 2nd fl kitchen remodel. remove all finishes, install (n) electrical, move gas line, install (n) finishes. no exterior or structural work.Details
2nd fl kitchen remodel. remove all finishes, install (n) electrical, move gas line, install (n) finishes. no exterior or structural work. | $19,500 |
| Jul 30, 2008 | Completed final sign-off Jan 2009 | 563 12th Av | remodel (e) garage space to paint studio. add bathroom, remodel (e) kitchen and breakfast room to family room. lower 1st floor level by 10"Details
remodel (e) garage space to paint studio. add bathroom, remodel (e) kitchen and breakfast room to family room. lower 1st floor level by 10" | $85,000 |