Back to bathroom remodel contractors
Tosick Remodels
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Jun 2023
- Last 24 months
- 0 permits filed
30 permits since 2000: 24 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 16 completed, 1 never finaled. Typically 0 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 3, 2022 | Completed final sign-off Jun 2023 | 2182 48th Av | removal of existing sub floor on level 1 and replace w/new concrete slab on grade and exterior sunken patio. floor plan reconfigured on level 1 and new code compliant stair, new bathroom and laundry room. new and replaced windows on the rear yard facade.Details
removal of existing sub floor on level 1 and replace w/new concrete slab on grade and exterior sunken patio. floor plan reconfigured on level 1 and new code compliant stair, new bathroom and laundry room. new and replaced windows on the rear yard facade. | $95,000 |
| Dec 14, 2021 | Completed final sign-off Mar 2024 | 1371 40th Av | add bathroom office and bedroom at ground floor. provide new wood flooring, new bathroom fixtures and tile, dry wall throughout including garage. replace extg slider door with wood french doors at rear elevation. no structural work.Details
add bathroom office and bedroom at ground floor. provide new wood flooring, new bathroom fixtures and tile, dry wall throughout including garage. replace extg slider door with wood french doors at rear elevation. no structural work. | $40,000 |
| Sep 28, 2020 | Completed final sign-off Apr 2021 | 3392 16th St | bathroom remodel: demo to studs, new insullation, plumbing electrical fixtures to sty i same location. replce tub with shower. new tile. vanity and plumbing fixtures. new electrical fixtures.Details
bathroom remodel: demo to studs, new insullation, plumbing electrical fixtures to sty i same location. replce tub with shower. new tile. vanity and plumbing fixtures. new electrical fixtures. | $25,000 |
| Jun 8, 2020 | Completed final sign-off Apr 2021 | 2223 44th Av | 1/f: remodel of (e) bathroom and walk-in closet. new plumbing fixturs, new cabinets, finishes and lighting. elarge footprint of (e) walk-in closet.Details
1/f: remodel of (e) bathroom and walk-in closet. new plumbing fixturs, new cabinets, finishes and lighting. elarge footprint of (e) walk-in closet. | $20,000 |
| Oct 2, 2018 | Completed final sign-off Aug 2019 | 3392 16th St | demo guest bath and abbutting wall. expand size as indicated in plans. add a shower, replace all plumbing fixtures at same location. update bath electr and plumb. remove additional walls per plans. repair and patch plaster as needed. new tile at guest bathDetails
demo guest bath and abbutting wall. expand size as indicated in plans. add a shower, replace all plumbing fixtures at same location. update bath electr and plumb. remove additional walls per plans. repair and patch plaster as needed. new tile at guest bath | $50,000 |
| Oct 2, 2018 | Completed final sign-off Aug 2019 | 438 08th Av | unit 201. remodel (e) condo kitchen and guest bath. remove west wall of kitchen, cabinets, flooring and drywall. remove all fixtures and replace w/ (n), update elect and plumb and fixtures at both kitchen and guest bath, shower surround w/ (n) tile. new fan and floors at guest bathDetails
unit 201. remodel (e) condo kitchen and guest bath. remove west wall of kitchen, cabinets, flooring and drywall. remove all fixtures and replace w/ (n), update elect and plumb and fixtures at both kitchen and guest bath, shower surround w/ (n) tile. new fan and floors at guest bath | $40,000 |
| Oct 2, 2018 | Completed final sign-off Feb 2020 | 390 Franconia St | legalize downstairs renovation done by previous owner. space includes 1 bathroom and 2 roomsDetails
legalize downstairs renovation done by previous owner. space includes 1 bathroom and 2 rooms | $10,000 |
| Aug 31, 2018 | Completed final sign-off Dec 2018 | 438 08th Av | complete remodel of back bathroom all fixtures to remain in same location. install new shower valve & shower pan, new vanity sink faucet replace existing electrical fixtures.Details
complete remodel of back bathroom all fixtures to remain in same location. install new shower valve & shower pan, new vanity sink faucet replace existing electrical fixtures. | $20,000 |
| Aug 31, 2018 | Completed final sign-off Mar 2019 | 44 Amethyst Wy | strip existing upstairs bathroom to sutds replace existing shower pan with tilealbe shower pan. replace floor mortar bed & radiant loop, new tile on floor & shower surround. update electrical fixtures & plumbing fixtures. new dry wall, replace windows install pocket doorDetails
strip existing upstairs bathroom to sutds replace existing shower pan with tilealbe shower pan. replace floor mortar bed & radiant loop, new tile on floor & shower surround. update electrical fixtures & plumbing fixtures. new dry wall, replace windows install pocket door | $20,000 |
| Jan 4, 2017 | Completed final sign-off Oct 2017 | 150 Riverton Dr | interior remodel - kitchen & bathroom remodelDetails
interior remodel - kitchen & bathroom remodel | $70,000 |
| Dec 29, 2016 | Completed final sign-off Jun 2018 | 150 Lombard St | unit #904: reconfigure 2nd bedroom/den, reconfigure closet/hallway, remodel (e) kitchen & bathrooms. replace plumbing fixtures and appliances new lighting & electrical maher naDetails
unit #904: reconfigure 2nd bedroom/den, reconfigure closet/hallway, remodel (e) kitchen & bathrooms. replace plumbing fixtures and appliances new lighting & electrical maher na | $100,000 |
| Sep 20, 2016 | Completed final sign-off Jul 2017 | 1979 46th Av | reconfigure e master bath. replace fixtures, vanity and tile in e bath. new lighting, elec, and plumbing in baths. new skylight in master bathDetails
reconfigure e master bath. replace fixtures, vanity and tile in e bath. new lighting, elec, and plumbing in baths. new skylight in master bath | $18,000 |
| Aug 11, 2014 | Completed final sign-off Feb 2015 | 85 Mirabel Av | bathroom remodel; demo to studs: replace with novertical fiberglass. required, new plumbing fixtures, tub, vanity, sink & toilet. new drywall, tile backer, new tile & finishes. insulation, replace existing exhaust fan/gfci.Details
bathroom remodel; demo to studs: replace with novertical fiberglass. required, new plumbing fixtures, tub, vanity, sink & toilet. new drywall, tile backer, new tile & finishes. insulation, replace existing exhaust fan/gfci. | $15,000 |
| Aug 11, 2014 | Completed final sign-off Mar 2015 | 1344 Alabama St | bathroom remodel. demo to studs. replace 2 windows not visible from street. elect & plumb as required. new insulation. new plumbing fixtures, tub, vanity, sink & toilet. washer/dryer as currentlyconfigured, new drywall, tile backer, new tile floor/surround. replace (e) exhaust fan, finishes.Details
bathroom remodel. demo to studs. replace 2 windows not visible from street. elect & plumb as required. new insulation. new plumbing fixtures, tub, vanity, sink & toilet. washer/dryer as currentlyconfigured, new drywall, tile backer, new tile floor/surround. replace (e) exhaust fan, finishes. | $15,000 |
| Apr 16, 2009 | Completed final sign-off Sep 2009 | 1248 Treat Av | remodel of bathroom 2nd. flr.-demo to studs & joists-relocate sink, toilet-remove bathtub. replace w/ custom shower pan. relocate elec. (sconces, overhead lt. gcfi, rec). insulate & new drywall/tile backer, new tile floor & walls.Details
remodel of bathroom 2nd. flr.-demo to studs & joists-relocate sink, toilet-remove bathtub. replace w/ custom shower pan. relocate elec. (sconces, overhead lt. gcfi, rec). insulate & new drywall/tile backer, new tile floor & walls. | $8,500 |
| Sep 4, 2007 | Completed final sign-off Feb 2008 | 1998 Vallejo St | unit#8. 2 bathroom remodel. new plubing fixtures, tile, lighting.Details
unit#8. 2 bathroom remodel. new plubing fixtures, tile, lighting. | $20,000 |
| Sep 23, 2005 | Never finaled issued Sep 2005, no final | 2392 48th Av | kitchen bath remodel: remve partition wall dividing kitchen, dr::moverange,move fridge, new plumbing, elec, dry wall, appliances, cabinets, bath. expand shower move partition in closet new plumbiing, elec, drywall, tile, fixtures, valves non structural workDetails
kitchen bath remodel: remve partition wall dividing kitchen, dr::moverange,move fridge, new plumbing, elec, dry wall, appliances, cabinets, bath. expand shower move partition in closet new plumbiing, elec, drywall, tile, fixtures, valves non structural work | $15,000 |