Back to kitchen remodel contractors
Top Quality Construction
- Based in
- Antioch
- On San Francisco permits
- May 2024 to Sep 2026
- Last 24 months
- 3 permits filed
5 permits since 2000: 2 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 13 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2025 | Completed final sign-off Dec 2025 | 64 El Sereno Ct | renovation of the kitchen in kin located on the upper floor. remove non structural dividing wall between kitchen and breakfast nook to increase the kitchen space. one window infilled. 1 window replaced in kind. new electrical and panel in garage. wall btwn kitchen/dining rm reduced.appliances moved.Details
renovation of the kitchen in kin located on the upper floor. remove non structural dividing wall between kitchen and breakfast nook to increase the kitchen space. one window infilled. 1 window replaced in kind. new electrical and panel in garage. wall btwn kitchen/dining rm reduced.appliances moved. | $40,000 |