Top Builder Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2010 to Sep 2024
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 367 days from filing to permit and 263 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2010 | Completed final sign-off Jan 2012 | 2550 21st Av | two stories horizontal addition, 4th ft. to rear & 4 ft to both sides (total 350 sq ft.) ground floor, change from 3 bedrooms to 2 bedrooms, 2nd floor, relocate stairs from 2nd floor to ground floor, kitchen remodeling and relocate 2 bedrooms.Details
two stories horizontal addition, 4th ft. to rear & 4 ft to both sides (total 350 sq ft.) ground floor, change from 3 bedrooms to 2 bedrooms, 2nd floor, relocate stairs from 2nd floor to ground floor, kitchen remodeling and relocate 2 bedrooms. | $80,000 |