Tom Ganley Construction
- Based in
- San Rafael
- On San Francisco permits
- Aug 2007 to Apr 2016
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 27 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2010 | Completed final sign-off Jul 2011 | 2527 15th Av | demolition of a portion of the (e) front stairs (partial). removal of all the (e) guardrails, new stairs are to be built in place of those demolished to match the remaining (e) stairs. new guardrails are to be built to replace those removedDetails
demolition of a portion of the (e) front stairs (partial). removal of all the (e) guardrails, new stairs are to be built in place of those demolished to match the remaining (e) stairs. new guardrails are to be built to replace those removed | $5,500 |