- 11 permits filed
13 permits since 2000: 7 completed, 6 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 2 completed, 3 in progress. Typically 36 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | In progress issued Aug 2026 | 913 Florida St | reconfiguration of kitchen, living/dining areasand bath; add new en suite bath, all at 2nd floor; convert 1st floor to conditioned space with family room, bedroom and bath. infill of gorund level lightwell.Details
reconfiguration of kitchen, living/dining areasand bath; add new en suite bath, all at 2nd floor; convert 1st floor to conditioned space with family room, bedroom and bath. infill of gorund level lightwell. | $250,000 |
| May 1, 2026 | In progress issued Jun 2026 | 2547 20th Av | reno to reconfigure kitchen, dining and bedrm areas; add 1 new en-suite bath and 1 1 half bath; and reconfigure existing bath all @ 2nd fl; add new interior stair connecting 1st and 2nd fl; and expanding living space @ 1st fl level w/family room; bedroom, bath & office; add 4 new skylightsDetails
reno to reconfigure kitchen, dining and bedrm areas; add 1 new en-suite bath and 1 1 half bath; and reconfigure existing bath all @ 2nd fl; add new interior stair connecting 1st and 2nd fl; and expanding living space @ 1st fl level w/family room; bedroom, bath & office; add 4 new skylights | $300,000 |
| Sep 4, 2025 | In progress issued Jun 2026 | 230 Staples Av | renovation & addition -2nd flr: replace all (e) single pane windows w/ double pan window. enlarge kitchen & bathrm. (n) family rm.(n) upper deck. -1st flr: convert partial garage to utility rm, convert (e) storage to bedrm.#3 & bath.#2, convert (e) bedrm. to game rm, (n) master suite,(n) lower deck.Details
renovation & addition -2nd flr: replace all (e) single pane windows w/ double pan window. enlarge kitchen & bathrm. (n) family rm.(n) upper deck. -1st flr: convert partial garage to utility rm, convert (e) storage to bedrm.#3 & bath.#2, convert (e) bedrm. to game rm, (n) master suite,(n) lower deck. | $505,000 |
| May 20, 2025 | Completed final sign-off Jan 2026 | 3761 21st St | replace all (e) windows, (n) windows at master bedroom & (e) bath #3, (n) master bathroom with 2 (n) skylights, bath #3 renovation, electrical upgrade to 200 amp panel & rewire entire house. kitchen renovation with (n) folding door, relocate powder room. convert (e) bathroom to bedroom #4.Details
replace all (e) windows, (n) windows at master bedroom & (e) bath #3, (n) master bathroom with 2 (n) skylights, bath #3 renovation, electrical upgrade to 200 amp panel & rewire entire house. kitchen renovation with (n) folding door, relocate powder room. convert (e) bathroom to bedroom #4. | $250,000 |
| Sep 9, 2024 | Completed final sign-off Nov 2024 | 1735 Mcallister St | legalize (e) bathroom at bedroom. remove non-bearing pony wall at kitchen.Details
legalize (e) bathroom at bedroom. remove non-bearing pony wall at kitchen. | $10,000 |