Todd Zaionz Construction
- Based in
- Pleasanton
- On San Francisco permits
- Mar 2017 to Mar 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 8 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 24, 2021 | Completed final sign-off Apr 2021 | 525 Wisconsin St | repair (e) exterior rear deck, less than 50% replacement, trex decking/railings, not visible from streetDetails
repair (e) exterior rear deck, less than 50% replacement, trex decking/railings, not visible from street | $5,000 |
| Dec 14, 2018 | Completed final sign-off Feb 2020 | 1454 Palou Av | revision to app#201711274857. modify as approved deck footings at rear with new retaining wall to pick up deck posts and stairs to access rear yard.Details
revision to app#201711274857. modify as approved deck footings at rear with new retaining wall to pick up deck posts and stairs to access rear yard. | $10,000 |
| Nov 27, 2017 | Completed final sign-off Feb 2020 | 1454 Palou Av | remodel s.f.d. - 1st floor; add bedroom, bathroom, w/d. 2nd floor: add new deck, change the layout of of the kitchen & bathroom, studio. 3rd floor: add new bathroom.Details
remodel s.f.d. - 1st floor; add bedroom, bathroom, w/d. 2nd floor: add new deck, change the layout of of the kitchen & bathroom, studio. 3rd floor: add new bathroom. | $30,000 |
| Aug 17, 2017 | Completed final sign-off May 2018 | 1479 Newcomb Av | residential remodel - add rooms down, add new bath room. remove walls, add new partition walls, remodel kitchen. add new deck at rear, add new window at front elevationsDetails
residential remodel - add rooms down, add new bath room. remove walls, add new partition walls, remodel kitchen. add new deck at rear, add new window at front elevations | $60,000 |