Back to bathroom remodel contractors
Todd Zaionz Construction
- Based in
- Pleasanton
- On San Francisco permits
- Mar 2017 to Mar 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 40 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 20, 2019 | Never finaled issued Sep 2019, no final | 2936 Griffith St | bathroom repair remodl and adding 1 ele recpt. tesla car chargerDetails
bathroom repair remodl and adding 1 ele recpt. tesla car charger | $2,650 |
| Nov 7, 2018 | Completed final sign-off Jul 2019 | 1631 La Salle Av | revision to pa 2018-0124-9446 to relocate (e) bathroom and interior stair & infill (e) light well at 2nd floor. reconfigure rooms layout at ground floorDetails
revision to pa 2018-0124-9446 to relocate (e) bathroom and interior stair & infill (e) light well at 2nd floor. reconfigure rooms layout at ground floor | $10,000 |
| May 9, 2018 | Completed final sign-off Mar 2019 | 1664 Newcomb Av | remodel (e) kitchen & add washer/dryer at 2nd & 3rd fl. remodel (e) bathrooms on 2nd & 3rd fl.Details
remodel (e) kitchen & add washer/dryer at 2nd & 3rd fl. remodel (e) bathrooms on 2nd & 3rd fl. | $22,000 |
| Jan 24, 2018 | Completed final sign-off Jul 2019 | 1631 La Salle Av | relocate (e) kitchen & bedroom per plan and add 1 new bath & remodl (e) bath room @ 2nd floor; construct new rear dect at 2nd floor attached to (e) bldg. add 2 new bathrooms and one new bedroom, one storage, & laundry area at ground floor.Details
relocate (e) kitchen & bedroom per plan and add 1 new bath & remodl (e) bath room @ 2nd floor; construct new rear dect at 2nd floor attached to (e) bldg. add 2 new bathrooms and one new bedroom, one storage, & laundry area at ground floor. | $80,000 |
| Nov 27, 2017 | Completed final sign-off Feb 2020 | 1454 Palou Av | remodel s.f.d. - 1st floor; add bedroom, bathroom, w/d. 2nd floor: add new deck, change the layout of of the kitchen & bathroom, studio. 3rd floor: add new bathroom.Details
remodel s.f.d. - 1st floor; add bedroom, bathroom, w/d. 2nd floor: add new deck, change the layout of of the kitchen & bathroom, studio. 3rd floor: add new bathroom. | $30,000 |
| Oct 20, 2017 | Completed final sign-off May 2018 | 61 Curtis St | remodel kitchen, relocate bathroom on 2nd floor, add new bathroom at 3rd level. modification extg interior partition walls. no changes proposed to exterior.Details
remodel kitchen, relocate bathroom on 2nd floor, add new bathroom at 3rd level. modification extg interior partition walls. no changes proposed to exterior. | $15,000 |
| Aug 17, 2017 | Completed final sign-off May 2018 | 1479 Newcomb Av | residential remodel - add rooms down, add new bath room. remove walls, add new partition walls, remodel kitchen. add new deck at rear, add new window at front elevationsDetails
residential remodel - add rooms down, add new bath room. remove walls, add new partition walls, remodel kitchen. add new deck at rear, add new window at front elevations | $60,000 |