Back to kitchen remodel contractors
Timber-Rock Craftsmen
- Based in
- San Francisco
- On San Francisco permits
- Sep 2014 to Aug 2019
- Last 24 months
- 0 permits filed
13 permits since 2000: 10 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 never finaled. Typically 8 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 14, 2019 | Completed final sign-off Dec 2019 | 2939 Webster St | rev to permit# 201905221391 revised location of (n) bathroom & relocated kitchen, increased skylight size, remodel & relocated kitchen window an added sun tunnel to bathrooomDetails
rev to permit# 201905221391 revised location of (n) bathroom & relocated kitchen, increased skylight size, remodel & relocated kitchen window an added sun tunnel to bathrooom | |
| May 6, 2019 | Completed final sign-off Sep 2019 | 2649 34th Av | revision to pa# 201903296714. replace existing kitchen and bath windows. 5 total.Details
revision to pa# 201903296714. replace existing kitchen and bath windows. 5 total. | $6,500 |
| Mar 29, 2019 | Completed final sign-off Sep 2019 | 2649 34th Av | kitchen & bathroom remodel. demo of (e) fixts & non bearing walls.Details
kitchen & bathroom remodel. demo of (e) fixts & non bearing walls. | $95,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 746 Divisadero St | removing (e) sun room at rear, renovations of (e) kitchen and bathrooms, revised room layout, associated structural improvements to (e) framing *note; 2nd floorDetails
removing (e) sun room at rear, renovations of (e) kitchen and bathrooms, revised room layout, associated structural improvements to (e) framing *note; 2nd floor | $150,000 |
| Nov 17, 2016 | Completed final sign-off Jan 2017 | 1058 Sanchez St | one kitchen & one bath remodel. replace cabinets & bath fixtures. upgrade plumbing & electrical in kitchen & bath onlyDetails
one kitchen & one bath remodel. replace cabinets & bath fixtures. upgrade plumbing & electrical in kitchen & bath only | $8,000 |
| Jul 25, 2016 | Completed final sign-off Nov 2016 | 214 Bradford St | kitchen and bathroom remodel, finsihes,fixtures, fittings. new wood backyard deck. plumbging/elec under spearate permit. minor alterations to front facade.Details
kitchen and bathroom remodel, finsihes,fixtures, fittings. new wood backyard deck. plumbging/elec under spearate permit. minor alterations to front facade. | $45,000 |
| Jul 15, 2016 | Completed final sign-off Sep 2016 | 216 Bradford St | kitchen remodel, new cabinetry, fixtures, appliances & wall & floor finishesDetails
kitchen remodel, new cabinetry, fixtures, appliances & wall & floor finishes | $20,000 |
| Sep 9, 2014 | Never finaled issued Sep 2014, no final | 1940 Bush St | 1/f level only: partially renovate existing kitchen, new bathroom at existing powder (add shower), relocate existing washer/dryer and hot water heater at existing exterior patio area.Details
1/f level only: partially renovate existing kitchen, new bathroom at existing powder (add shower), relocate existing washer/dryer and hot water heater at existing exterior patio area. | $15,000 |