Back to bathroom remodel contractors
Tim Lawlor Construction
- Based in
- Pacheco
- On San Francisco permits
- Apr 2012 to Aug 2016
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2016 | Completed final sign-off May 2017 | 4317 26th St | (1) kitchen and (1) bathroom remodel. expand kitchen using extg home office, relocate plmg and gas line in kitchen. relocate plmg in bathroom. new material throughout.Details
(1) kitchen and (1) bathroom remodel. expand kitchen using extg home office, relocate plmg and gas line in kitchen. relocate plmg in bathroom. new material throughout. | $100,000 |
| Oct 17, 2014 | Completed final sign-off Jan 2015 | 1714 41st Av | bathroom remodel, upgdate bathroom flooring and fixtures.Details
bathroom remodel, upgdate bathroom flooring and fixtures. | $35,000 |
| Apr 3, 2012 | Completed final sign-off Jun 2012 | 4544 Fulton St | full bath remodel, bring down to studs. install new tub, toilet, vanity, tile, sheet rock, exhaust fan. wall at long side of tub relocated 7" into closet to make bath larger. new light fixutre and recepticals addedDetails
full bath remodel, bring down to studs. install new tub, toilet, vanity, tile, sheet rock, exhaust fan. wall at long side of tub relocated 7" into closet to make bath larger. new light fixutre and recepticals added | $20,000 |