Block 2009, lot 006
1714 41st Ave
- City’s use
- Single Family Residential
- Built
- 1940
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 1 bathroom
- Building
- 1,150 sq ft
- Lot
- 1,746 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 27, 2015 | Completed final sign-off Aug 2015 | 1714 41st Av | California Structural Restoration | expansion in scope of repair of existing permit no. 201507161722, additional termite repair as per item 3b of wood destroying pests report #210965 dated 7/17/2015. stucco replacement area in-kind with approx. 55 sf to 75 sf at interior stairway.Details
expansion in scope of repair of existing permit no. 201507161722, additional termite repair as per item 3b of wood destroying pests report #210965 dated 7/17/2015. stucco replacement area in-kind with approx. 55 sf to 75 sf at interior stairway. | $4,000 |
| Jul 16, 2015 | Completed final sign-off Aug 2015 | 1714 41st Av | California Structural Restoration | dryrot repair as per item 3a of attached wdo report # 210964 dated 7/9/15 done by california structural restoration. like kind repair of exterior stucco wall.Details
dryrot repair as per item 3a of attached wdo report # 210964 dated 7/9/15 done by california structural restoration. like kind repair of exterior stucco wall. | $7,000 |
| Nov 10, 2014 | Never finaled issued Nov 2014, no final | 1714 41st Av | street spaceDetails
street space | ||
| Oct 17, 2014 | Completed final sign-off Jan 2015 | 1714 41st Av | Tim Lawlor Construction | bathroom remodel, upgdate bathroom flooring and fixtures.Details
bathroom remodel, upgdate bathroom flooring and fixtures. | $35,000 |
| Jul 1, 2014 | Completed final sign-off Aug 2014 | 1714 41st Av | Seismic Retrofitters Inc. | voluntary strenghthening add plywood, bolt foundation and hold downs.Details
voluntary strenghthening add plywood, bolt foundation and hold downs. | $10,000 |
| Jun 18, 2014 | Never finaled issued Jun 2014, no final | 1714 41st Av | street spaceDetails
street space | ||
| Jun 10, 2014 | Never finaled filed Jun 2014, never issued | 1714 41st Av | replace 2 windows at front with aluminum-clad wood sash within existing opennings. repair stucco and lath at front; return to original detail.Details
replace 2 windows at front with aluminum-clad wood sash within existing opennings. repair stucco and lath at front; return to original detail. | ||
| Jun 10, 2014 | Expired or cancelled expired Jul 2015 | 1714 41st Av | California Structural Restoration | dryrot repair as per item 3a of wdo report 210937 stucco removal sheathing replacement, 2 new windows, new stucco lath & stucco coat.Details
dryrot repair as per item 3a of wdo report 210937 stucco removal sheathing replacement, 2 new windows, new stucco lath & stucco coat. | $15,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- California Structural Restoration (3), Seismic Retrofitters Inc., Tim Lawlor Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.