Back to kitchen remodel contractors
Thompson Brooks Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Jul 2018
- Last 24 months
- 0 permits filed
124 permits since 2000: 88 completed, 5 never finaled, 31 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 292 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2016 | Completed final sign-off Sep 2017 | 3806 22nd St | minor interior kitchen renovation. 1 wall & 1 appliance as shown on provided drawings.Details
minor interior kitchen renovation. 1 wall & 1 appliance as shown on provided drawings. | $5,000 |
| Jun 22, 2016 | Completed final sign-off Jun 2017 | 1250 Jones St | remodel of extg bathroom and kitchen. addition of powder room. new lighting and finishes throughout.Details
remodel of extg bathroom and kitchen. addition of powder room. new lighting and finishes throughout. | $100,000 |
| Aug 3, 2015 | Completed final sign-off Aug 2017 | 235 Chestnut St | partial interior remodel. replace electrical and plumbing. remove partial interior wall add closets. remodel existing kitchen and bathroom. relocate kitchen window. install hydraulic heat system and on demand tankless water heater. remove forced air system. add exterior insulation. new dry wall.Details
partial interior remodel. replace electrical and plumbing. remove partial interior wall add closets. remodel existing kitchen and bathroom. relocate kitchen window. install hydraulic heat system and on demand tankless water heater. remove forced air system. add exterior insulation. new dry wall. | $50,000 |
| Jun 24, 2014 | Completed final sign-off Jan 2015 | 301 Mission St | unit #57b: remodel of kitchen & 2 bathrooms, new cabinets & fixtures & appliances, everything stays the same, kitchen lighting new shall be "led", (2) bathroom exh fans to remain as is; maher n/aDetails
unit #57b: remodel of kitchen & 2 bathrooms, new cabinets & fixtures & appliances, everything stays the same, kitchen lighting new shall be "led", (2) bathroom exh fans to remain as is; maher n/a | $150,000 |
| May 20, 2010 | Completed final sign-off Sep 2010 | 2118 Vallejo St | 3rd fl: move (e) office to new locatio to create new closet. 4rd fl: move (e) kitchen to family room. new office relocates to (e) kitcgen space to be removed. no exterior work, no struc. work.Details
3rd fl: move (e) office to new locatio to create new closet. 4rd fl: move (e) kitchen to family room. new office relocates to (e) kitcgen space to be removed. no exterior work, no struc. work. | $45,000 |
| May 4, 2010 | Completed final sign-off Oct 2010 | 2006 Washington St | unit #5 -complete remodel of 2 (e) bath, partial remodel of one existing bath, replace one wall of cabients in kitchen, knew appliances in kitchen, addition of new lighting in hallways & kitchen.Details
unit #5 -complete remodel of 2 (e) bath, partial remodel of one existing bath, replace one wall of cabients in kitchen, knew appliances in kitchen, addition of new lighting in hallways & kitchen. | $265,000 |
| Jan 11, 2010 | Completed final sign-off Oct 2010 | 2505 Divisadero St | remodel of (1) kitchen & (7) bathrooms, kitchen: 50% high efficacy by wattage, bathrooms: high efficacy or cooupancy sensor control.Details
remodel of (1) kitchen & (7) bathrooms, kitchen: 50% high efficacy by wattage, bathrooms: high efficacy or cooupancy sensor control. | $200,000 |
| Mar 16, 2006 | Completed final sign-off Jan 2007 | 3460 Baker St | repair water damage to plywd & framing at master bedrm, kitchen and 1st floor bedrm, repair/replace 10-20 existing hold downs additional work to app no. 200602235250(in-kind replacement only)Details
repair water damage to plywd & framing at master bedrm, kitchen and 1st floor bedrm, repair/replace 10-20 existing hold downs additional work to app no. 200602235250(in-kind replacement only) | $20,000 |
| Nov 18, 2004 | Completed final sign-off Jun 2006 | 2440 Pacific Av | kitchen addition, removal of stairs, replace windows, replace front entry steps.Details
kitchen addition, removal of stairs, replace windows, replace front entry steps. | $60,000 |
| Apr 27, 2004 | Completed final sign-off Nov 2005 | 130 Seacliff Av | voluntary seismic upgrade-foundation,steel frames,shear walls.open kitchen to living rm.new balconyDetails
voluntary seismic upgrade-foundation,steel frames,shear walls.open kitchen to living rm.new balcony | $520,000 |
| Aug 3, 2001 | Expired or cancelled expired Dec 2001 | 3675 Jackson St | demo interior non structural finishes only,demo finishes in kitchen,powder room,master bathrm,masterDetails
demo interior non structural finishes only,demo finishes in kitchen,powder room,master bathrm,master | $4,000 |
| Jun 29, 2001 | Completed final sign-off Dec 2001 | 47 Jordan Av | soft demo work only/ kitchen, breakfast rm, family rmDetails
soft demo work only/ kitchen, breakfast rm, family rm | $5,000 |
| Jun 8, 2000 | Completed final sign-off Jul 2000 | 3445 Jackson St | change fireplace in kitchen martin sb4800 to brick masonryDetails
change fireplace in kitchen martin sb4800 to brick masonry | $3,000 |