Back to kitchen remodel contractors
Thomas Le Construction Inc
- Based in
- Woodside
- On San Francisco permits
- Oct 2012 to Aug 2026
- Last 24 months
- 20 permits filed
48 permits since 2000: 33 completed, 11 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 11 completed, 4 in progress. Typically 0 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 6, 2026 | Completed final sign-off Jul 2026 | 2145 Franklin St | kitchen remodel remove non bearing wall between kitchen and great room.Details
kitchen remodel remove non bearing wall between kitchen and great room. | $45,000 |
| Jul 17, 2025 | In progress issued Jul 2025 | 766 Chenery St | rev to pa# 2025-0325-2936: rear siding repair and replace 1 window bedroom and 1 window kitchenDetails
rev to pa# 2025-0325-2936: rear siding repair and replace 1 window bedroom and 1 window kitchen | $10,000 |
| Mar 25, 2025 | In progress issued Mar 2025 | 766 Chenery St | 2nd fl: remove wall between kitchen and dining. add 1/2 bath. 3rd fl expand and remodel bathroom. enlarge closetDetails
2nd fl: remove wall between kitchen and dining. add 1/2 bath. 3rd fl expand and remodel bathroom. enlarge closet | $95,000 |
| Jan 6, 2025 | In progress issued Feb 2025 | 674 Noe St | interior alteration to existing 3-story, single family dwelling. remodel existing kitchen and bathroom. no proposed work to exterior.Details
interior alteration to existing 3-story, single family dwelling. remodel existing kitchen and bathroom. no proposed work to exterior. | $55,000 |
| Oct 18, 2024 | Completed final sign-off Mar 2025 | 793 09th Av | remodel (e) kitchen & bathroom. all work in-kind. no strucutal or wall modifications. replace 3 rear facing windows.Details
remodel (e) kitchen & bathroom. all work in-kind. no strucutal or wall modifications. replace 3 rear facing windows. | $80,000 |
| May 2, 2024 | Completed final sign-off Oct 2025 | 51 Encanto Av | interior remodel to (e) 2-stry single family dwelling: remodel (e) kitchen at 1st floor, remove interior walls at 1st floor to create great room, demo (e) stair from garage to 1st floor and replace with (n) stair from garage to 1st floor.Details
interior remodel to (e) 2-stry single family dwelling: remodel (e) kitchen at 1st floor, remove interior walls at 1st floor to create great room, demo (e) stair from garage to 1st floor and replace with (n) stair from garage to 1st floor. | $75,000 |
| Dec 7, 2022 | Completed final sign-off Jun 2023 | 1556 Geneva Av | #2: renovate kitchen- new cabinet- new tile renovate bathroom- new bath tub, toilet, vanity. move electrical panel and move from closet to hallway. new sheet rock- replace old sheetrock with new ones. the replacement gypboard must be 5/8" type x 5d under nails @ 4" o.g. or equivalent screws.Details
#2: renovate kitchen- new cabinet- new tile renovate bathroom- new bath tub, toilet, vanity. move electrical panel and move from closet to hallway. new sheet rock- replace old sheetrock with new ones. the replacement gypboard must be 5/8" type x 5d under nails @ 4" o.g. or equivalent screws. | $45,000 |
| Apr 14, 2021 | Completed final sign-off Jul 2021 | 1930 33rd Av | remove existing bearing wall between kitchen & living room. kitchen remodel.Details
remove existing bearing wall between kitchen & living room. kitchen remodel. | $20,000 |
| Mar 3, 2021 | Completed final sign-off Oct 2021 | 59 Prospect Av | kitchen remodel, no wall move.Details
kitchen remodel, no wall move. | $18,000 |
| Jan 12, 2021 | In progress issued Aug 2024 | 1439 Oak St | remodel 2nd & 3rd floors: unit #1 - (n) bedroom & remodel kitchen; unit #2 - (n) kitchen and (n) bathroom, (n) windows at kitchen & bathroom; reconfigure unit #3 into (n) unit #3 and #4 - unit #3 - 2 (n) bedrooms, (n) bath, (n) laundry, (n) kitchen; unit #4 - 2 (n) bedrooms, (n) bath, (n) kitchen;Details
remodel 2nd & 3rd floors: unit #1 - (n) bedroom & remodel kitchen; unit #2 - (n) kitchen and (n) bathroom, (n) windows at kitchen & bathroom; reconfigure unit #3 into (n) unit #3 and #4 - unit #3 - 2 (n) bedrooms, (n) bath, (n) laundry, (n) kitchen; unit #4 - 2 (n) bedrooms, (n) bath, (n) kitchen; | $400,000 |
| Jun 6, 2019 | Completed final sign-off Dec 2021 | 148 Brussels St | horizontal addition on both levels in rear of property. lower level: (n) family room, guest bedroom & full bath. upper level: (n) master bedroom w/ full master bath, relocate kitchen, laundry roomDetails
horizontal addition on both levels in rear of property. lower level: (n) family room, guest bedroom & full bath. upper level: (n) master bedroom w/ full master bath, relocate kitchen, laundry room | $200,000 |
| Feb 22, 2019 | Completed final sign-off Jul 2019 | 1335 Willard St | kitchen remodel, demo wall between living room & dining room; demo wall between kitchen and dining room, repair plaster ceiling in bedroom, living room and dining room; install lights in dining room and living roomDetails
kitchen remodel, demo wall between living room & dining room; demo wall between kitchen and dining room, repair plaster ceiling in bedroom, living room and dining room; install lights in dining room and living room | $20,000 |
| Dec 21, 2018 | Completed final sign-off Dec 2019 | 733 09th Av | top floor 739 kitchen remodel, extensive dryrot repair interior 150 sq ft. remove existing gypbd replace with new 5/8th inches type "x"Details
top floor 739 kitchen remodel, extensive dryrot repair interior 150 sq ft. remove existing gypbd replace with new 5/8th inches type "x" | $20,000 |
| Jun 11, 2018 | Completed final sign-off Dec 2018 | 831 Hampshire St | work is on 831 hampshire. cosmetic upgrade of kitchen & bathroom. no other plumbing work. electrical upgrade for the whole unit. lighting per ce c 150.0 (k). kitchen size 175 sq ft & bathroom 35 sq ft.Details
work is on 831 hampshire. cosmetic upgrade of kitchen & bathroom. no other plumbing work. electrical upgrade for the whole unit. lighting per ce c 150.0 (k). kitchen size 175 sq ft & bathroom 35 sq ft. | $41,817 |
| Aug 21, 2017 | Completed final sign-off Jun 2019 | 40 Thrift St | permit for kitchen: install (n) light fixture, new cabinets, one new sink & faucet, new hood fan, new cooktop, new oven, new flooring, new refrigerator all in (e) location. remove (e) pocketdoor, remove interior window.Details
permit for kitchen: install (n) light fixture, new cabinets, one new sink & faucet, new hood fan, new cooktop, new oven, new flooring, new refrigerator all in (e) location. remove (e) pocketdoor, remove interior window. | $5,000 |