Back to kitchen remodel contractors
Thomas K. Deely
- Based in
- San Francisco
- On San Francisco permits
- Sep 2004 to Dec 2017
- Last 24 months
- 0 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 101 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2014 | Completed final sign-off Jul 2015 | 711 03rd Av | remodel kitchen and bathroom on 2nd floor. addition of new rear deck and stairway.Details
remodel kitchen and bathroom on 2nd floor. addition of new rear deck and stairway. | $18,000 |
| Jun 28, 2011 | Completed final sign-off Aug 2011 | 650 Lombard St | removal of old kitchen cab & replace with 7 new cabs & countertop. no change to walls, window or door or ceilings lighting to comply to cec 150 (k)Details
removal of old kitchen cab & replace with 7 new cabs & countertop. no change to walls, window or door or ceilings lighting to comply to cec 150 (k) | $9,240 |
| Apr 10, 2009 | Completed final sign-off Jul 2009 | 1861 Powell St | remove & replace (1) kitchen cabinets, sink, counter. replace (1) toilet, tub in bathroom, no change to lighting or wall finishes.Details
remove & replace (1) kitchen cabinets, sink, counter. replace (1) toilet, tub in bathroom, no change to lighting or wall finishes. | $8,000 |
| May 19, 2008 | Completed final sign-off Jun 2008 | 650 Lombard St | install 4 kitchen cabinets trim out addition @ existing kitchen @ new area of kitchen.Details
install 4 kitchen cabinets trim out addition @ existing kitchen @ new area of kitchen. | $600 |
| Mar 24, 2008 | Completed final sign-off Apr 2008 | 47 Walter St | revision to pa# 2007/08/20/0277 to delete proposed propertyline window enlargement and infill ex. kitchen windowDetails
revision to pa# 2007/08/20/0277 to delete proposed propertyline window enlargement and infill ex. kitchen window | $300 |
| Aug 20, 2007 | Completed final sign-off Apr 2008 | 47 Walter St | ground floor unit #47 - install new kitchen cabinets, install new property line window (replaced old one) different size and location, install new bath with shower, toilet, & vanity, install new lighting in kitchen and bath.Details
ground floor unit #47 - install new kitchen cabinets, install new property line window (replaced old one) different size and location, install new bath with shower, toilet, & vanity, install new lighting in kitchen and bath. | $40,000 |
| May 30, 2007 | Completed final sign-off Dec 2007 | 43 Walter St | work in 47 walter. remove cabinets, plate lathe off kitchen walls explore only. no structural or lighting changes.Details
work in 47 walter. remove cabinets, plate lathe off kitchen walls explore only. no structural or lighting changes. | $5,000 |