Back to kitchen remodel contractors
Thomas Cunniff Construction
- Based in
- Kensington
- On San Francisco permits
- Apr 2001 to Jun 2011
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 54 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2010 | Completed final sign-off Apr 2010 | 517 Los Palmos Dr | install recessed lighting in living room. h.e. lights or non h.e. light controlled by dimmer switches per t-24. install 2 new cabinets in kitchen + counter. replace 2 windows in kitchen (in kind) with new retrofit windows. no structural changes. window not visible from street.Details
install recessed lighting in living room. h.e. lights or non h.e. light controlled by dimmer switches per t-24. install 2 new cabinets in kitchen + counter. replace 2 windows in kitchen (in kind) with new retrofit windows. no structural changes. window not visible from street. | $6,000 |
| Oct 6, 2003 | Completed final sign-off Nov 2003 | 6 Van Buren St | replace kitchen cabinets, stove, dishwasher. new electrical circuits as req by code.Details
replace kitchen cabinets, stove, dishwasher. new electrical circuits as req by code. | $17,500 |