Thomas Andert Construction
- Based in
- Novato
- On San Francisco permits
- Jul 2000 to Apr 2006
- Last 24 months
- 0 permits filed
11 permits since 2000: 7 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2001 | Completed final sign-off Jan 2002 | 32 Laidley St | replace damage under stairs/garage area (termite/dryrot) includes stairs 8a,9a,11b on termite reportDetails
replace damage under stairs/garage area (termite/dryrot) includes stairs 8a,9a,11b on termite report | $16,500 |
| Jul 10, 2001 | Expired or cancelled cancelled Oct 2024 | 32 Laidley St | repair damage under stairs/garage area (termite/dryrot). termite report #700818792 on 8a, 9a, 11b..Details
repair damage under stairs/garage area (termite/dryrot). termite report #700818792 on 8a, 9a, 11b.. | $16,500 |