Thir Coast Suinear Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Dec 2010
- Last 24 months
- 0 permits filed
7 permits since 2000: 7 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 50 days from filing to permit and 271 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2010 | Completed final sign-off Jun 2012 | 2971 Lake St | add elevator next to interior stair from gr fl to 3rd fl. convert crawl space into game room, add 1/2 bath, and laundry at gr floor.add 1/2 bath at 2nd fl, legalize study & family room @ ground floor.Details
add elevator next to interior stair from gr fl to 3rd fl. convert crawl space into game room, add 1/2 bath, and laundry at gr floor.add 1/2 bath at 2nd fl, legalize study & family room @ ground floor. | $90,000 |
| Sep 8, 2010 | Completed final sign-off Dec 2010 | 306 Connecticut St | replace exsiting broken foundation. reinforcing existing floor joists. repair (e) stair landing in basementDetails
replace exsiting broken foundation. reinforcing existing floor joists. repair (e) stair landing in basement | $25,000 |