Back to bathroom remodel contractors
The One Construction Llc
- Based in
- South San Francisco
- On San Francisco permits
- Jun 2012 to Jul 2025
- Last 24 months
- 2 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2025 | Completed final sign-off Feb 2026 | 1854 30th Av | kitchen remodel: install cabinets,appliances, fixtures, tiles,countertops, outlets, led lights. bathroom remodel: install tub, shower fixtures and faucets, tiles, install led lights, toilet, outlets vanity. (in kind remodel no layout change).Details
kitchen remodel: install cabinets,appliances, fixtures, tiles,countertops, outlets, led lights. bathroom remodel: install tub, shower fixtures and faucets, tiles, install led lights, toilet, outlets vanity. (in kind remodel no layout change). | $40,000 |
| Aug 29, 2024 | Completed final sign-off Jan 2025 | 1731 33rd Av | remodel 1 (e) bathroom. change tub into shower/shower pan, demo e) shower, change single sink to double vanity. add led lights, no layout or structural changes. 30" min & 1024 sf in min. @ showerDetails
remodel 1 (e) bathroom. change tub into shower/shower pan, demo e) shower, change single sink to double vanity. add led lights, no layout or structural changes. 30" min & 1024 sf in min. @ shower | $10,000 |
| Oct 10, 2023 | Completed final sign-off Aug 2024 | 16 Shawnee Av | revision to permit 202306291234. show one (e) window on 2nd fl. replace 6 windows face to rear yard. change bathroom layout on the 2nd fl. remove office at 1st fl.Details
revision to permit 202306291234. show one (e) window on 2nd fl. replace 6 windows face to rear yard. change bathroom layout on the 2nd fl. remove office at 1st fl. | $20,000 |
| Jun 29, 2023 | Completed final sign-off Aug 2024 | 16 Shawnee Av | 2nd flr: relocate kitchen, remodel two bathrooms, add new bathroom and enclosed a light court. 1st flr: add a family rm w/ wet bar, an office, a media rm, a bathroom. relocate furnace, water heater, washer and dryer, install two skylights. no work to front facade.Details
2nd flr: relocate kitchen, remodel two bathrooms, add new bathroom and enclosed a light court. 1st flr: add a family rm w/ wet bar, an office, a media rm, a bathroom. relocate furnace, water heater, washer and dryer, install two skylights. no work to front facade. | $200,000 |
| Sep 27, 2022 | Completed final sign-off Oct 2022 | 339 Mount Vernon Av | bathroom remodel: replace bathtub, faucets, vanity, floor and shower tile. painting for bath. (no layout change)Details
bathroom remodel: replace bathtub, faucets, vanity, floor and shower tile. painting for bath. (no layout change) | $9,000 |
| Nov 26, 2014 | Completed final sign-off Jan 2015 | 72 Cook St | remodel split bathroom & upgrade electrical main to 125amp. no layout change.Details
remodel split bathroom & upgrade electrical main to 125amp. no layout change. | $12,200 |
| Oct 7, 2013 | Completed final sign-off Jul 2014 | 50 Mirando St | remodel kitchen and 3 bathrooms, refinish laundry room, add exterior door to rear yard, replace all aluminum windows with vinyl windows in same size & location.Details
remodel kitchen and 3 bathrooms, refinish laundry room, add exterior door to rear yard, replace all aluminum windows with vinyl windows in same size & location. | $45,000 |
| Aug 23, 2013 | Completed final sign-off Oct 2013 | 819 Bosworth St | remodel kitchen: remove & install countertop, sink, range, refrigerator, dishwashter, range hood & microwave, faucet, garbage disposal (no layout change). bathroom: remove & install bathtub (shower pan), faucet, exhaust fan, light fixture (no layout change).Details
remodel kitchen: remove & install countertop, sink, range, refrigerator, dishwashter, range hood & microwave, faucet, garbage disposal (no layout change). bathroom: remove & install bathtub (shower pan), faucet, exhaust fan, light fixture (no layout change). | $22,000 |
| Jan 22, 2013 | Completed final sign-off Mar 2013 | 1465 38th Av | bathroom remodel. no wall removal.Details
bathroom remodel. no wall removal. | $9,500 |
| Dec 21, 2012 | Completed final sign-off Aug 2013 | 52 Clarendon Av | remodel (1) master bathrm no layout change, bathroom no layout change, powder rm, no layout change and kitchen no layout changeDetails
remodel (1) master bathrm no layout change, bathroom no layout change, powder rm, no layout change and kitchen no layout change | $38,000 |
| Jun 25, 2012 | Completed final sign-off Jul 2012 | 1960 Hayes St | kitchen and bath remodel. no moving walls or ceilings.Details
kitchen and bath remodel. no moving walls or ceilings. | $10,000 |