Block 6758, lot 030
821 Bosworth St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 3, 2022 | Completed final sign-off Dec 2022 | 821 Bosworth St | removal & replacement of existing garage door + opener. garage is located on ground level attached to front of dwelling.Details
removal & replacement of existing garage door + opener. garage is located on ground level attached to front of dwelling. | $1,856 | |
| Apr 5, 2019 | Completed final sign-off Jun 2019 | 819 Bosworth St | Wei Ouyang Dba Ouyang Construction | to comply with physiscal inspection report # cc-8323Details
to comply with physiscal inspection report # cc-8323 | |
| Dec 10, 2018 | Completed final sign-off Feb 2019 | 819 Bosworth St | to confirm/correct unit count as a 2 unit dwelling bldg. for legal use and occupancy. this determination was made based on tax records and sanborn maps. no work on this permitDetails
to confirm/correct unit count as a 2 unit dwelling bldg. for legal use and occupancy. this determination was made based on tax records and sanborn maps. no work on this permit | ||
| Jul 11, 2018 | Completed final sign-off Jul 2018 | 819 Bosworth St | to obtain final inspection for work approved under pa 2007-1108-7732 all work is complete.Details
to obtain final inspection for work approved under pa 2007-1108-7732 all work is complete. | ||
| Jul 11, 2018 | Completed final sign-off Jul 2018 | 819 Bosworth St | to obtain final inspection for work approved under pa 2007-0907-2081 all work is complete.Details
to obtain final inspection for work approved under pa 2007-0907-2081 all work is complete. | ||
| Aug 23, 2013 | Completed final sign-off Oct 2013 | 819 Bosworth St | The One Construction Llc | remodel kitchen: remove & install countertop, sink, range, refrigerator, dishwashter, range hood & microwave, faucet, garbage disposal (no layout change). bathroom: remove & install bathtub (shower pan), faucet, exhaust fan, light fixture (no layout change).Details
remodel kitchen: remove & install countertop, sink, range, refrigerator, dishwashter, range hood & microwave, faucet, garbage disposal (no layout change). bathroom: remove & install bathtub (shower pan), faucet, exhaust fan, light fixture (no layout change). | $22,000 |
| Jun 21, 2011 | Completed final sign-off Sep 2011 | 819 Bosworth St | repair stairs and balusters that have dryrot. less than 50%.Details
repair stairs and balusters that have dryrot. less than 50%. | $2,500 | |
| Nov 8, 2007 | Never finaled issued Nov 2007, no final | 819 Bosworth St | Maap Corp Dba Save Energy Co | replace all windows on front of building. 10 windows with fiberglass windows. low "e" value <.67.Details
replace all windows on front of building. 10 windows with fiberglass windows. low "e" value <.67. | $10,000 |
| Sep 7, 2007 | Never finaled issued Sep 2007, no final | 819 Bosworth St | Grace Roofing & Construction | reroofing.Details
reroofing. | $7,300 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Grace Roofing & Construction, Maap Corp Dba Save Energy Co, The One Construction Llc, Wei Ouyang Dba Ouyang Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.