Back to kitchen remodel contractors
The Meticulous Handyman Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2025 to Aug 2026
- Last 24 months
- 12 permits filed
12 permits since 2000: 7 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 in progress. Typically 3 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2026 | Completed final sign-off Jun 2026 | 4020 20th St | kitchen main floor - replace cabinets, countertops, appliances & sink & fixtures using (e) locations & waste supply lines, (e) electrical systems & locations. work inkindDetails
kitchen main floor - replace cabinets, countertops, appliances & sink & fixtures using (e) locations & waste supply lines, (e) electrical systems & locations. work inkind | $30,000 |
| Apr 27, 2026 | In progress issued Apr 2026 | 57 Alpine Tr | replace cabinets, countertops, plumbing fixtures in kitchen. replace tile, plumbing/electrical fixtures in primary bathroom. using (e) locations in both bathroom and kitchen . replace 6 windows at rear. no structrual or layout changes.Details
replace cabinets, countertops, plumbing fixtures in kitchen. replace tile, plumbing/electrical fixtures in primary bathroom. using (e) locations in both bathroom and kitchen . replace 6 windows at rear. no structrual or layout changes. | $280,000 |
| Jan 16, 2026 | In progress issued Jan 2026 | 3338 Scott St | remodel 1 bathroom & 1 kitchen. add 1 new bathroom to (e) footprint. washer/dryer in-unit relocation. all work on level 3.Details
remodel 1 bathroom & 1 kitchen. add 1 new bathroom to (e) footprint. washer/dryer in-unit relocation. all work on level 3. | $98,000 |
| Aug 4, 2025 | Completed final sign-off Sep 2026 | 999 Green St | remodel 3 (e) bathrooms (n) fixtures, tile, vanities, plaster, paint. bath 1: shower remains. bath 2: shower/tub remains. bath 3: replace shower with bath/shower combo. replace (e) lighting and add new cans, remodel (e) kitchen: new cabinetry & appliances in (e) locations. new flooring, paint.Details
remodel 3 (e) bathrooms (n) fixtures, tile, vanities, plaster, paint. bath 1: shower remains. bath 2: shower/tub remains. bath 3: replace shower with bath/shower combo. replace (e) lighting and add new cans, remodel (e) kitchen: new cabinetry & appliances in (e) locations. new flooring, paint. | $650,000 |
| Mar 21, 2025 | Completed final sign-off Feb 2026 | 2973 Clay St | demo sections of non strucrtural walls for open floor plan. remodel 2 bathrooms and kitchen. refinish floors throughout upgrade electrical outlets, subpanel and relocate washer and dryer to hall closet and paint.Details
demo sections of non strucrtural walls for open floor plan. remodel 2 bathrooms and kitchen. refinish floors throughout upgrade electrical outlets, subpanel and relocate washer and dryer to hall closet and paint. | $350,000 |