Back to bathroom remodel contractors
The Garza Company
- Based in
- San Lorenzo
- On San Francisco permits
- Dec 2002 to Aug 2015
- Last 24 months
- 0 permits filed
21 permits since 2000: 14 completed, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 4 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 83 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2015 | Never finaled issued Aug 2015, no final | 950 Duncan St | to add this application #201506108646. upgrade bathroom. replace bathtubes, replace shower valves, replace shower doors, wall enclosure, switches, receptacles, light fixturs. no new walls. no structural work.Details
to add this application #201506108646. upgrade bathroom. replace bathtubes, replace shower valves, replace shower doors, wall enclosure, switches, receptacles, light fixturs. no new walls. no structural work. | |
| Sep 25, 2014 | Completed final sign-off Jan 2015 | 1172 Stanyan St | remodel the kitchen. replace the cabinets, counter top, sink, hood range and install ceramic floor tile on the floor. no walls removed, moved or added in kitchen or bathroom. all layouts to remain the same. remodel bathroom: replace tub, vanity, floor and install new ceiling exhaust fan.Details
remodel the kitchen. replace the cabinets, counter top, sink, hood range and install ceramic floor tile on the floor. no walls removed, moved or added in kitchen or bathroom. all layouts to remain the same. remodel bathroom: replace tub, vanity, floor and install new ceiling exhaust fan. | $16,000 |
| Feb 11, 2014 | Completed final sign-off Apr 2014 | 1821 Baker St | remodel kitchen and bathroom. install or replace the cabinets., countertops, floor, sink, hot water heater and hood range. no walls removed, moved or added in kitchen and bathroom. all layouts to remain the same. bathroom: replace the tub sink and floor and exhaust fan.Details
remodel kitchen and bathroom. install or replace the cabinets., countertops, floor, sink, hot water heater and hood range. no walls removed, moved or added in kitchen and bathroom. all layouts to remain the same. bathroom: replace the tub sink and floor and exhaust fan. | $25,000 |
| May 22, 2012 | Never finaled issued May 2012, no final | 256 Alma St | replace (e) kitchen cabinets, sink, faucets & dishwasher, replace (e) bath tub and shower valves, repl existing sink & faucets, add gfci outlets over the counter top, relocate (e) drain line for washing machine (exposed dwv line); verify in field (e)bathrm bath fan,high efficacy light @ bathrm/ktcnDetails
replace (e) kitchen cabinets, sink, faucets & dishwasher, replace (e) bath tub and shower valves, repl existing sink & faucets, add gfci outlets over the counter top, relocate (e) drain line for washing machine (exposed dwv line); verify in field (e)bathrm bath fan,high efficacy light @ bathrm/ktcn | $15,000 |
| Mar 23, 2011 | Completed final sign-off Jul 2011 | 3916 24th St | work on #3916 only - to comply with his nov# 201081526 dated 12.13.2010. interior alteration and partial renovation for new bathroom at third floor. replace kitchen cabinets and (e) bathroom fixtures, and upgrade electricalDetails
work on #3916 only - to comply with his nov# 201081526 dated 12.13.2010. interior alteration and partial renovation for new bathroom at third floor. replace kitchen cabinets and (e) bathroom fixtures, and upgrade electrical | $40,000 |
| Jan 25, 2010 | Completed final sign-off Mar 2010 | 1725 Taylor St | kitchen remodel, new cabinets,sink,d/washer. recess lights. bathroom remodel:shower valves, sink, gfci outlet light. relocate electrical panel outside the closet. 4 additonal recess lights. no change to exhaust system. in apt 5cDetails
kitchen remodel, new cabinets,sink,d/washer. recess lights. bathroom remodel:shower valves, sink, gfci outlet light. relocate electrical panel outside the closet. 4 additonal recess lights. no change to exhaust system. in apt 5c | $25,000 |
| Mar 20, 2009 | Expired or cancelled expired Oct 2010 | 1725 Taylor St | work @ unit# 3d only. kitchen: new cabinets, sink, counter tops, disposal, lights, bath# 1: new shower valves, tub surround, vanity sink, light fixture. bath# 2: new shower pan, shower valves, shower surround, vanity sink, light. (1 kitchen & 2 bathrooms remodel) no structural work.Details
work @ unit# 3d only. kitchen: new cabinets, sink, counter tops, disposal, lights, bath# 1: new shower valves, tub surround, vanity sink, light fixture. bath# 2: new shower pan, shower valves, shower surround, vanity sink, light. (1 kitchen & 2 bathrooms remodel) no structural work. | $30,943 |