The Construction Guy Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Sep 2017
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 never finaled. Typically 3 days from filing to permit and 287 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2016 | Completed final sign-off Sep 2017 | 225 Banks St | revision to pa 201607283680, install new retaining wall in front of (e) retaining wall. provide walls on 2nd flr as shown. provide and install radiant floor fan (2) bedrooms, living rm & kitchen on 2nd floor.Details
revision to pa 201607283680, install new retaining wall in front of (e) retaining wall. provide walls on 2nd flr as shown. provide and install radiant floor fan (2) bedrooms, living rm & kitchen on 2nd floor. | $22,000 |
| Jul 28, 2016 | Completed final sign-off Sep 2017 | 225 Banks St | 2nd floor - relocate bathroom, new kitchen cabinets, relocate range & sink. provide exhaust fan for range. new plumbing & electrical for kitchen & bathrooms. 1st floor - add 1/2 bath & laundry, move closet walls in bedrooms. legalize (e) full bath and bedroom @ 1st floorsDetails
2nd floor - relocate bathroom, new kitchen cabinets, relocate range & sink. provide exhaust fan for range. new plumbing & electrical for kitchen & bathrooms. 1st floor - add 1/2 bath & laundry, move closet walls in bedrooms. legalize (e) full bath and bedroom @ 1st floors | $20,000 |
| Oct 27, 2015 | Completed final sign-off Nov 2016 | 29 Bradford St | interior renovation with no change to extg bldg footprint. create new habitable sq ft on ground level, reducing size of garage. new foundation upgrades and other structural upgrades for removal of walls upstairs. relocate kitchen and bath upstairs and provide nw bath downstairs.Details
interior renovation with no change to extg bldg footprint. create new habitable sq ft on ground level, reducing size of garage. new foundation upgrades and other structural upgrades for removal of walls upstairs. relocate kitchen and bath upstairs and provide nw bath downstairs. | $150,000 |
| May 18, 2015 | Completed final sign-off Aug 2015 | 655 Corbett Av | unit # 206:demo kitchen cabnts, countertops & assoc items. demo 2(e) bath: tile, vanities, tub. install kitchen cabinets, extend elec circuits for countertops and fridg, connect sink & garbage disposal & dw to (e) plumb. provide & install new floor & wall tile, toilet in (e) location. vanities in ..Details
unit # 206:demo kitchen cabnts, countertops & assoc items. demo 2(e) bath: tile, vanities, tub. install kitchen cabinets, extend elec circuits for countertops and fridg, connect sink & garbage disposal & dw to (e) plumb. provide & install new floor & wall tile, toilet in (e) location. vanities in .. | $35,000 |
| Dec 12, 2014 | Never finaled issued Jul 2016, no final | 1076 Rhode Island St | addition of upper fl above (e) 2 levels (40'x25'), lower level addition of (40'x25')rear addition of 10'for(e)+(n)bldg and 12'x15' bump out in rear bldg. const kitchen for each unit along w/ 6 bathrms and living space.Details
addition of upper fl above (e) 2 levels (40'x25'), lower level addition of (40'x25')rear addition of 10'for(e)+(n)bldg and 12'x15' bump out in rear bldg. const kitchen for each unit along w/ 6 bathrms and living space. | $200,000 |
| Jul 9, 2014 | Completed final sign-off Nov 2014 | 1765 09th Av | demolish (e) cabinets, countertop, sink, reuse (e) dishwasher, oven, cooktop & refrigerator. demolish non structural wall between kitchen & dining room, install (n) cabinets in same location and (n) base cabinets where (e) wall was, install (n) outlet, reuse (e) circuit, new shut off valves for h/cDetails
demolish (e) cabinets, countertop, sink, reuse (e) dishwasher, oven, cooktop & refrigerator. demolish non structural wall between kitchen & dining room, install (n) cabinets in same location and (n) base cabinets where (e) wall was, install (n) outlet, reuse (e) circuit, new shut off valves for h/c | $8,000 |
| May 14, 2014 | Completed final sign-off Dec 2014 | 458 Anderson St | front bldg: renovation to kitchen, alterations to interior walls, new siding in select locations, replace windows and entry doors, repair to decks, replace in kind entry stair and guardrailDetails
front bldg: renovation to kitchen, alterations to interior walls, new siding in select locations, replace windows and entry doors, repair to decks, replace in kind entry stair and guardrail | $87,000 |
| Dec 19, 2013 | Completed final sign-off Nov 2014 | 556 Chenery St | remodel kitchen & 2 bathrooms. demolish & replace (e) cabinets, flooring & windows & door in like kind. provide elec circuit for garbage disposal @ kitchen. demolish (e) toilet, vanity, shower/tub tile & shower valve & install (n) toilet, shower tile, floor tile, shower valve & vanity in like kind.Details
remodel kitchen & 2 bathrooms. demolish & replace (e) cabinets, flooring & windows & door in like kind. provide elec circuit for garbage disposal @ kitchen. demolish (e) toilet, vanity, shower/tub tile & shower valve & install (n) toilet, shower tile, floor tile, shower valve & vanity in like kind. | $30,000 |