Back to kitchen remodel contractors
The Construction Guy
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Jun 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 2 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2013 | Completed final sign-off Jun 2014 | 1350 San Bruno Av | renovation of kitchen, alterations to interior walls, new master bedroom within existing building envelope, reolcateion of washer and dryer, widen rear door of unit, replacement windows in some locations and elimination of 2 openings per plan.Details
renovation of kitchen, alterations to interior walls, new master bedroom within existing building envelope, reolcateion of washer and dryer, widen rear door of unit, replacement windows in some locations and elimination of 2 openings per plan. | $50,000 |
| May 7, 2013 | Completed final sign-off Aug 2013 | 2733 Harrison St | residential kitchen remodel, replace existing lightwell window, replace existing back door.Details
residential kitchen remodel, replace existing lightwell window, replace existing back door. | $20,000 |
| Mar 18, 2009 | Completed final sign-off Oct 2009 | 827 14th St | demolish (e) 42" wall between living rm & kitchen in unit 829. demolis 3'-8" long (e) wall between bedroom & office unit 829a. level kitchen bath & laundry subfloor. provide (n) chse wall between laundry area on both floors. demo (e) heaters units 829-829a. provide (n) heaters units 827,829 & 829a.Details
demolish (e) 42" wall between living rm & kitchen in unit 829. demolis 3'-8" long (e) wall between bedroom & office unit 829a. level kitchen bath & laundry subfloor. provide (n) chse wall between laundry area on both floors. demo (e) heaters units 829-829a. provide (n) heaters units 827,829 & 829a. | $25,000 |