That's Women's Work Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Feb 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 329 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2006 | Expired or cancelled expired Jan 2013 | 50 Edinburgh St | to address nov #200667195 - creating habitable space in the storage area behind the garage, rebuild interior stair between levels. new decks at both levels with new stair to rear yard. horizontal additionDetails
to address nov #200667195 - creating habitable space in the storage area behind the garage, rebuild interior stair between levels. new decks at both levels with new stair to rear yard. horizontal addition | $30,000 |